Orange County NC Website
Article 6: Development Standards 71 <br /> Section 6.14: Stormwater Management <br /> (c) Annual inspections shall begin within one year of the f;l;n^ date of+he <br /> ,-leer) for the cGnn.issuance of the Certificate of Stormwater Compliance <br /> for the SCM.176 <br /> (d) The Erosion Control Officer will inspect each SCM approved pursuant to <br /> these rules approximately every five years. In the event the Erosion <br /> Control Officer discovers the need for corrective action of improvements, <br /> he/she shall notify the owning entity of the needed SCM 177 improvements <br /> and the date by which the corrective action is to be completed. All <br /> SCM178 improvements shall be made consistent with the PIaRs and <br /> &P&G... .op of+he Stour Water oop+rol s+rHo+6Ire and the operation and <br /> maip+epap^e play or maRua4approved SMP and the approved OM .179 <br /> After notification by the owning entity, the Erosion Control Officer shall <br /> inspect and approve the completed SCM180 improvements. <br /> (5)(6) Annu t 5-year SCM181 Maintenance Inspection Fee <br /> (a) The€e_-5-year SCM maintenance inspection fee for the first 5-year <br /> period 182 shall be paid before: <br /> (l) The release of any Final Certificate of Occupancy for Non_ <br /> Residential Proper issuance of the Certificate of Stormwater <br /> Compliance for the SCM.183 <br /> (II) The release of the construction bond for Residential or Non_ <br /> Residential Proper release of up to 75% of the value of the <br /> SCM Performance Guarantee.184 <br /> (b) The fee-5-year SCM maintenance inspection fee shall be based upon the <br /> current Orange County Planning Fee Schedule, and shall be paid to <br /> Orange County following each aRR61al 5-year SCM185 inspection. <br /> (c) Failure to pay the Annual Maintenance inspection Fee5-year SCM <br /> maintenance inspection fee shall be deemed a violation of this <br /> Ordinance. <br /> 6.14.11 Amendments to Approved Clans and Spe^ificationsSCMS186 <br /> (A) Minor Amendments to Approved SCM187 Plans and Specifications <br /> 176 Clarification of requirements. <br /> 17 Clarification that this is referencing"SCM" improvements. <br /> 178 Clarification that this is referencing"SCM" improvements. <br /> 179 Clarification of requirements. <br /> ...Clarification that this is referencing"SCM" improvements. <br /> 1s1 Correct reference to the 5-year inspection fee. Orange County does not require annual SCM inspection fees— <br /> NOTE: "5-year SCM maintenance inspection fee"is integrated through the remainder of Section 6.14, where <br /> warranted. <br /> "I Clarification of requirements. <br /> ...Clarification of requirements. <br /> 184 Clarification of requirements. <br /> 115 Clarification of requirements. <br /> 1s6 Section 6.14.11 describes the processes for amendments/revisions to approved SCM plans and specifications, <br /> as well as amendments/revisions to the SCM Operation and Maintenance Agreement, so the title of Section <br /> 6.14.11 has been revised to"Amendments to Approved SCMs". <br /> 18'Clarification that this sub-section is referencing"Approved SCM" Plans and Specifications. <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-108 <br />