Orange County NC Website
Article 6: Development Standards 65 <br /> Section 6.14: Stormwater Management <br /> provisions of this Section, unless and until a Stormwater Management Plan (SMP) has <br /> been reviewed and approved in accordance with Section 2.21.1 of this Ordinance. <br /> (B) Compliance with Requirements <br /> Any person engaged in new development activities as defined by this Section who fails to <br /> file a plan in accordance with this Ordinance, or who conducts any new development <br /> except in accordance with provisions of an approved Stormwater Management nlanSMP <br /> shall be deemed in violation of this Ordinance. <br /> (C) Enforceable Restriction <br /> Approval of the c+nrm,.,ater Management nlanSMP shall require an enforceable <br /> restriction on property usage that runs with the land, such as a recorded deed restriction <br /> or protective covenants, to ensure that future development and redevelopment maintains <br /> the site consistent with the approved SMP. <br /> 6.14.10 Operation and Maintenance of Stormwater Control Measures (SCMs) <br /> (A) Posting of-Performance GuaranteesFinancial S^ for SCMs131 <br /> See Section 6.22 of this Ordinance for SCM performance guarantee standards.133 All <br /> SGIVIsApproval of the SMP shall be conditioned on the posting of an SCM performance <br /> puaranteeadeq a+e finanGial ���„ran e for the purpose of SCM construction, if SCM <br /> c., edrmonstruction is applicable. maintenance, repairs or reconstruction necessary fo <br /> dr <br /> e .uate performance. Financial Tvance an� �-±I aarance the <br /> assurance shell he On the form of one of th <br /> adequate <br /> 134 <br /> 0) ity for Con f Required Improvements'15 <br /> rT�Ses�,R,-��,--w,T&t�uEt+e�t�r �r <br /> (a\a) The permit applicant shall provide one of the following as surety formerhehe <br /> completion of required improvements: <br /> r� A perfnrmanGe hnnra surety hnnrding c� therized <br /> irk � rete a <br /> t,r�AR irreVeGable letter Gred;'t or other TS# +Tear'!•, <br /> � <br /> cnn•iertihle in+n Goch at face value payable to (bonne GGUR+•� <br /> Cash <br /> of� <br /> ,1.,,., <br /> Cash plac escrow with rwith a financial institution designatea-_,arl e� <br /> an official depository of Orange County-. <br /> ly) The bond or other instrument zrshall he in an amp nte Iu ato 5 <br /> tomes the total cost of the SCM as estimated by the"applicant <br /> and approved by the County Engineer. <br /> !�i�Tot Total Cost <br /> a The total cost of the sago shall include the following: <br /> iThe yal -e of allall materials s Unh as and <br /> other stn Gt Pres• <br /> H. Seeding apd soil s+ahiliza+inn• <br /> HI design and GRg'ReeF'Rg; nd <br /> 13z Clarification that posting of financial security is specific to"SCMs"only. <br /> 133 Reference to new section. <br /> 134 Section 6.14.10(A) revised to: 1) provide a correct reference to conditioned approval of the SMP, 2)clarify that <br /> financial security for SCMs is only required if SCMs are applicable,and 3) include a reference to Section 6.22(NEW <br /> SECTION). <br /> 131 SCM performance guarantee requirements have been moved to Section 6.22(NEW SECTION). <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-102 <br />