Orange County NC Website
Article 6: Development Standards 51 <br /> Section 6.4: Performance Standards <br /> (B) No Permitted Principal Use, Special Use, or Accessory Use in any district shall discharge <br /> into the OWASA, Durham or Hillsborough sewage treatment facilities any waste that <br /> cannot be adequately treated by biological means. <br /> 6.4.7 Hazardous Materials <br /> (A) General Standards <br /> Each permitted use, special use, and accessory use is required to comply with all <br /> applicable federal, state, and local rules and regulations governing the storage, use, and <br /> disposal of hazardous materials. <br /> (B) Additional Standards in Economic Development Districts <br /> (1) Each site plan must be accompanied by a Hazardous Materials Management <br /> Plan (HMMP) consisting of the following information: <br /> (a) A Materials Safety Data Sheet (MSDS)which lists the specific hazardous <br /> substances that a facility is handling and details its known health <br /> impacts, physical properties, and appropriate protective measures. a <br /> separate MSDS form must be submitted for each hazardous substance <br /> handled. <br /> (b) A Tier Two form which indicates the precise location and quantity of <br /> hazardous materials within a plant or place of business. <br /> (c) Building and site plans which indicate the precise location and quantity of <br /> hazardous materials. <br /> (2) An Environmental Assessment will be required for any use or facility which <br /> qualifies as a small or large generator of hazardous waste as defined by the N.C. <br /> Department of Environment and Natural Resources. Environmental Quality.95 <br /> (3) Any use or facility which is involved in the long-term storage or disposal of <br /> hazardous wastes will be required to submit a full Environmental Impact <br /> Statement. <br /> (4) Documentation must be provided as part of the HMMP confirming the following: <br /> (a) That hazardous wastes are being sent to an approved hazardous waste <br /> recycling, storage, treatment or disposal facility, <br /> (b) That an EPAID number has been obtained, <br /> (c) That only authorized transporters are used, and <br /> (d) That on-site storage is limited to 180 days (or up to 270 days if the waste <br /> is to be transported more than 200 miles). <br /> 6.4.8 Utilities <br /> (A) Economic Development Districts <br /> (1) Each permitted use, special use, and accessory use to be served by a public or <br /> private water or sewer system must be: <br /> (a) Designed, sized, and constructed to the standards of the utility provider; <br /> and <br /> (b) Ensured of installation of such services at the time it is approved. <br /> (2) Each MPD-CD Master Plan and site plan or NR-CD site plan must be <br /> accompanied by documentation from the utility provider that it has reviewed and <br /> approved: <br /> 9s Reflects current name of Department. <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-14 <br />