Browse
Search
Planning Board - 080421 ORC Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2021
>
Planning Board - 080421 ORC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 10:33:37 AM
Creation date
7/28/2021 10:27:30 AM
Metadata
Fields
Template:
BOCC
Date
8/4/2021
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 49 <br /> Section 5.21: Standards for Miscellaneous Uses <br /> (vii) Use of xeriscaping principles. <br /> (e) Stormwater Management <br /> (i) A stem;water management nlStormwater Management Plan <br /> (SMP)92?shall be prepared and reviewed in accordance with the <br /> provisions of Section 6.14 of this Ordinance. <br /> (ii) All drainage structures will be installed and maintained according <br /> to the approved Stormwater Management DIan SMP. <br /> (iii) Subdivisions that include Sstormwater CBontrol Mrneasures <br /> (SCMs) shall comply with Section 6.14 of this Ordinance. <br /> (f) Grading and Erosion Control <br /> (i) Plans for grading and erosion control comply with standards <br /> contained in the mango Geunt„Erosion arra ged'Mo„t r-„ntrgi <br /> Manualmost current version of the North Carolina Erosion and <br /> Sediment Control Planning and Design Manual,93 and this <br /> Ordinance; <br /> (ii) Construction is phased to the extent practical to minimize <br /> disturbance and sedimentation; <br /> (iii) Sediment control measures will be properly installed to filter <br /> sediment from runoff during construction and maintained until <br /> grading is complete and a permanent vegetative cover has been <br /> established and all slopes stabilized; and <br /> (iv) Permanent landscaping, groundcover, mulch, etc. will be <br /> installed as soon as practical after construction activities for each <br /> phase are completed. <br /> (g) Solid Waste Management Plan <br /> A solid waste management plan, submitted as part of the Resources <br /> Management Plan, shall include the method(s)of disposal and recycling <br /> of construction debris. <br /> (h) Irrigation <br /> (i) Irrigation systems for the subdivision and the lots in the <br /> subdivision are designed and can be operated according to a <br /> water conservation plan described in the Resources <br /> Management Plan submitted with the application; <br /> (ii) The Resources Management Plan shall identify the source(s)of <br /> water to be used for irrigation, the volume available for that <br /> purpose, and expected consumption rates. The system design <br /> and plan for operation will be evaluated based on efficiency; and <br /> (iii) Water recycled from stormwater retention ponds or treated <br /> wastewater effluent may be used for irrigation where it is a <br /> legally permitted alternative. <br /> (i) Habitat Maintenance <br /> 9z Consistent use of"Stormwater Management Plan (SMP)"—NOTE: "Stormwater Management Plan"and'SMP" <br /> is integrated through the remainder of Article 5, where applicable. <br /> 93 Correct reference to the North Carolina manual. There is no Orange County manual. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.