Article 2: Procedures 19
<br /> Section 2.18: Land Disturbing Permits (LDPs)21 F
<br /> (E) Orange County Watershed Matrix Table 25
<br /> �OUNTY WATERSHED MATRIX TABLE
<br /> Back Creek 20,000 21,780 43,560 **3.8 **1.43
<br /> E Haw Creek 20,000 21,780 43,560 **3.8 **1.43
<br /> Cane Creek *10,000 21,780 43,560 **3.8 **1.43
<br /> 3
<br /> Cane Creek Critical Area *10,000 21,780 43,560 **3.8 **1.43
<br /> LU = Haw River(protected) 20,000 21,780 43,560 **3.8 **1.43
<br /> LL
<br /> Lu Haw River(unprotected) 20,000 21,780 43,560 **3.8 **1.43
<br /> IL
<br /> Q
<br /> v E Jordan Lake (unprotected) 20,000 21,780 43,560 **2.2 **0.82
<br /> Q
<br /> CI Q) Jordan Lake (protected) 20,000 21,780 43,560 **2.2 **0.82
<br /> 0
<br /> a: University Lake *10,000 21,780 43,560 **2.2 **0.82
<br /> z
<br /> Z)I University Lake Critical Area *10,000 21,780 43,560 **2.2 **0.82
<br /> Flat River 20,000 12,000 21,780 2.2 0.33
<br /> Little River 20,000 12,000 21,780 2.2 0.33
<br /> a�
<br /> Upper Eno *10,000 12,000 21,780 22 0.33
<br /> L
<br /> LU Upper Eno Critical Area *10,000 12,000 21,780 22 0.33
<br /> LL
<br /> Lower Eno(unprotected) 20,000 12,000 21,780 22 0.33
<br /> Lower Eno(protected) 20,000 12,000 21,780 2.2 0.33
<br /> Y Hyco Creek 20,000 NA NA NA NA
<br /> O
<br /> z
<br /> Q
<br /> O South Hyco Creek 20,000 43,560 43,560 NA NA
<br /> *Waiver required.
<br /> **Jordan Lake nutrient export regulations not currently enforced.
<br /> NOTES:
<br /> [11 Thresholds are listed in square feet(SF).
<br /> [21 Not part of larger development. **joFdan Lake nutrient expert requiatmons not curFently
<br /> enforced:
<br /> [31 Nutrients listed in pounds/acre/year.
<br /> [4143,560 square feet=1 acre.
<br /> [51 21,780 square feet=%acre.
<br /> [61 10,890 square feet=%acre.
<br /> [71 Also be aware that your site plan may be constrained by riparian buffer requirements and impervious
<br /> limitations, in addition to typical zoning setback requirements.
<br /> 21 Section 2.18.1 (E)added and TABLE 2.18.1.E added.
<br /> Orange County, North Carolina-Unified Development Ordinance Page 2-61
<br />
|