Orange County NC Website
Advantages of Choosing DC Group for battery Installations <br /> DC Group Battery <br />Technician Technician <br />Professionally trained UPS technician <br />Free On-line inspection for the UPS <br />Knowledge of battery manufacturer model number and its <br />compatibility to specific UPS <br />Adjust UPS DC Float voltage to battery specifications <br />Preparedness for unforeseen situations <br />Battery discharge and Generator Test integrity <br />Documented procedures for battery replacement <br />Use of calibrated Cellcorder/Midtronic testing equipment <br />ISO 9000 certification <br />Cleaning of battery posts prior to install <br />Coating antioxidant grease on battery posts prior to install <br />Torque battery terminals to battery specifications <br />Inspect appearance and cleanliness of batteries <br />Inspect appearance and cleanliness of battery room <br />Measure and record total battery float voltage <br />Inspect the jars and covers for cracks and leakage <br />Measure and record the ambient temperature <br />Verify the condition of the ventilation equipment <br />Verify the integrity of the battery rack /cabinet <br />Measure and record representative cell temperatures <br />Measure and record internal resistance of all cells <br />Check the tightness on the inter-unit connectors <br />© 2021 DC Group, Inc.1.800.838.7927 | dc-group.com <br />DCG-QPM-FRM0025, Revision Date:11/8/2019Page 5 of 5 <br />DocuSign Envelope ID: 2B70AABF-AB52-4047-9943-D747A3989CBF