Orange County NC Website
Price Quotation <br />Quote Number: 0000582467 <br />Orange CountyTo: <br />Attn: <br />DC Group ID: <br />Site Phone: <br />Site Contact: <br />From: <br />Address: <br />Alan Dorman <br />DC Group, Inc. <br />Site Deployment Team <br />Alex Dachis <br />Phone: 1-800-838-7927 <br />Fax: 1-612-435-0601 <br />Quote Date: <br />Quote Expires: <br />ORCNTYNC01 <br />Alan Dorman <br />(919)619-8859 <br />Orange County <br />131 W Margaret Ln <br />Hillsborough, NC 27278-2547 <br />6/21/2021 <br />8/21/2021 <br />Fax: <br />Address: <br />Bill to / Quote to <br />Phone: <br />Asset MGMT-Facilities Division <br />Hillsborough, NC <br />919.619.8859 <br />Page 1 of 5 <br />ModelSystemManufacturerID <br />Existing Equipment: <br />Asset TagSerial No <br />BATT001S01ORCNTYNC01 Eaton BATTERY PWHR12390W4FRFC134DAA07 <br />This quote is for the purchase and installation of (40) CSB HRL12390 or equivalent batteries for the customer's 160kVA Eaton <br />9390 UPS unit (s/n: EC141CBA06). These batteries are being quoted for replacement as they have exceeded their end-of-life <br />age of four (4) years and will no longer be reliable in maintaining the load. In addition, components that are beyond their <br />end-of-life age are not covered under contract and any emergency service related to failed components beyond their <br />end-of-life age will be billable. <br />These batteries are to be installed by a DC Group certified UPS technician who is familiar with the operation of the UPS and <br />with UPS battery replacements. The batteries quoted here come with a 3-year manufacturer's warranty. Also included in this <br />quote is removal and disposal of the spent batteries in compliance with EPA regulations. <br />Freight is estimated for quoting purposes only. Estimated here is standard dock-to-dock delivery. Any special delivery <br />requirements, such as expedited shipment, a lift gate, or inside delivery will likely incur additional costs at the customer's <br />expense. <br />*All deliveries should be inspected by the facility upon arrival. If any damage is seen or suspected, a note will need to be <br />made on the BOL. If damage occurs during shipment and a note is not made on the BOL upon delivery, charges for <br />replacement product will apply.* <br />*Lead times vary based on manufacturer's availability.* <br />*Tax not included* <br />Equipment Quoted: <br />Quote: <br />Parts Cost:$8,740.38 <br />Standard Labor Cost:$1,478.00 <br />(Monday to Friday, 8:00 AM to 5:00 PM) <br />Premium Labor Cost:$1,938.00 <br />(Monday to Friday, 5:01 PM to 7:59 AM, all day Saturday) <br />Sunday/Holiday Labor Cost:$2,398.00 <br />(All day Sunday and Holidays) <br />Estimated Shipping Cost:$750.00 <br />© 2021 DC Group, Inc.1.800.838.7927 | dc-group.com <br />DCG-QPM-FRM0025, Revision Date:11/8/2019Page 1 of 5 <br />DocuSign Envelope ID: 2B70AABF-AB52-4047-9943-D747A3989CBF