<br />SScope of Work and <br />Technical Team <br /> <br /> <br />The information in this document is proprietary & confidential. <br /> <br /> <br />A large project locate will have to be called in for this size project. The first 5000ft will take 1 week after an <br />onsite meeting is done with the said contractor to clear for excavation. Then 3 to 4 days after said locating <br />time per 2000 to 3000ft to be located of existing utilities. <br /> <br /> All areas of non-hard pavement will be seed and strawed and or sod placed depending on the original <br />conditions at the time. <br /> <br />Final red lines will be present showing the location and depths of the said facility being installed after all work <br />and restoration have been completed. <br />Might be needed for project, owner provider <br />Equipment racks are not included in this proposal and are provided and installed by others. <br />Floor Cores and floor penetrations are not included in this proposal. <br />Overhead corridor basket tray or conduits inside buildings are not included in this proposal and is <br />provided by the electrical contractor. <br />Fire sleeves are not included in this proposal. <br />Fiber optic jumpers are not included in this proposal. <br />Active Network electronics, power strips, and UPS’s are not included in this proposal. <br />12 <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: F2D1756F-740F-4E82-9BEB-D1EEF4761E30