Orange County NC Website
<br />SScope of Work and <br />Technical Team <br /> <br /> <br />The information in this document is proprietary & confidential. <br /> <br />Provide all testing, labeling, as-built, and support documentation as required per scope of <br />work. <br /> <br />Alternate A - Fiber Optic Backbone Cabling Scope Summary: <br /> <br />The Town of Hillsborough <br /> <br />Provide and install (1) 12-Strand Singlemode OSP fiber between: <br />131 W. Margaret Lane (West Campus) to 127 N. Churton Street Police Annex) <br />127 N. Churton Street Police Annex) to 101 E. Orange Street (Town Hall) <br />101 E. Orange Street (Town Hall) to 105 Corbin Street (Annex Building) <br />All fiber will be terminated with LC connectors in new fiber enclosures at each location. <br />Provide all testing, labeling, as-built, and support documentation as required per scope of <br />work. <br />Engineering and Design & Permitting is included. <br /> <br /> <br />PROJECT COST SUMMARY <br /> <br />Base bid Price: $ 302,532.14 plus PPBond $4,538.00 <br /> <br /> <br />Alternate A Price: $151,034.20 <br /> <br /> <br />Directional Bore will be (2) 1.25 conduits along the ROW. 1 with OSP fiber optic cabling and 1 Conduit for <br />spare for future, or damages that may occur in the future. <br /> <br />Handboxes (HHS) will be 24x36x36 will be placed along the route accordingly. HHS will not be placed <br />any further than 1000ft. <br /> <br />HHs will be for storing slack and making turns along the route. HHS will hold a minimum of 50 to 75ft of slack. <br />All HHs will have 3 to 4 inches of gravel inside as well. <br /> <br /> A locate wire will be placed along the route as well for locating the facility in the future from possible <br />damages that may occur. The locate wire will be installed in the HHs and then grounded to a ground rod hat <br />will be placed in all HHs. <br /> <br />All building entrances will be done with PVC conduit to match the size of the Bore pipe being placed. All <br />building entrances will be reviewed with said customer before they are started. All building entrances will be <br />sealed with Hydraulic cementfor water and any type of erosion, that may enter. <br /> <br />All concrete removed for installation will be placed back to better or like conditions. All concrete will be <br />replaced from joint to joint. <br />11 <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: F2D1756F-740F-4E82-9BEB-D1EEF4761E30