Orange County NC Website
<br />SScope of Work and <br />Technical Team <br /> <br /> <br />The information in this document is proprietary & confidential. <br /> <br /> <br />SCOPE OF WORK <br /> <br />Please find our pricing for the following: <br />OSP Fiber Optic Backbone Cabling <br /> <br />Pricing is based on the following: <br />RFP 367-OC 5301 <br />Google Maps Images <br />Addendums 1, 2, 3, 4 & 5 <br /> <br /> <br />Structured Cabling System <br /> <br />Campus Wide Fiber Optic Backbone Cabling Scope Summary: <br />Provide and install (1) 144-Strand Singlemode OSP fiber between hand/manholes at 131 W. <br />Margaret Lane (West Campus) and 1200 US-70 West (Detention Center- North Campus). <br />Spliced 24-strands into the 144-strand fiber (above) for connectivity to 131 W. <br />Margaret Lane (West Campus). <br />Spliced 24-strands into the 144-strand fiber (above) for connectivity to 1200 US-70 <br />West (Detention Center- North Campus). <br />Provide and install (2) 6-Strand Singlemode OSP fiber from hand/manhole at North/South <br />Hassel St. to 300 W. Tryon St (Human Sciences Building). <br />(1) 6-strand will be spliced into the 144-strand fiber (above) for connectivity to 131 W. <br />Margaret Lane (West Campus). <br />(1) 6-strand will be spliced into the 144-strand fiber (above) for connectivity to 1200 <br />US-70 West (Detention Center- North Campus). <br />Provide and install fiber splice enclosures and associated hardware at each of the (3) <br />locations. <br />All fiber will be terminated with LC connectors in new fiber enclosures at each location. <br />Provide all testing, labeling, as-built, and support documentation as required per scope of <br />work. <br />Engineering and Design & Permitting is included. <br /> <br />Original and Campus Wide Fiber Optic Backbone Cabling (North Campus) Scope Summary: <br />Provide and install (1) 6-Strand Singlemode and (1) 6-strand multimode OSP fibers from MDF <br />in 1200 US-70 West (Detention Center- North Campus) to: <br />IDF in Parks Operations Base (POB) <br />IDF in Environmental and Agricultural (EAC) <br />All fiber will be terminated with LC connectors in new fiber enclosures at each location. <br />10 <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: F2D1756F-740F-4E82-9BEB-D1EEF4761E30