Browse
Search
2021-398-E-IT Dept.-NetPlanner Systems Inc-COVID-19 workforce safety plan
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-398-E-IT Dept.-NetPlanner Systems Inc-COVID-19 workforce safety plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 10:42:20 AM
Creation date
7/21/2021 10:40:17 AM
Metadata
Fields
Template:
Contract
Date
7/13/2021
Contract Starting Date
7/13/2021
Contract Ending Date
7/16/2021
Contract Document Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
44 <br /> <br />Revised NETPLANNER v2 <br /> <br />maintain a suit for personal injuries or property damage pursuant to the terms of provisions of <br />the Contract Documents. <br /> <br />ARTICLE 32. MEASUREMENT OF QUANTITIES <br /> <br />32.1 All Work completed under the Contract Documents shall be measured by the Contractor <br />using United States customary units of measurement. The method of measurement and <br />computations to be used in determination of quantities of material furnished and of Work <br />performed under the Contract Documents shall be those methods set forth in the Contract <br />Documents or, if not specifically set forth therein, the method generally recognized as <br />conforming to good engineering practice. <br /> <br />ARTICLE 33. TERMINATION BY THE OWNER FOR CAUSE <br /> <br />33.1 If the Contractor fails to begin or complete the Work under the Contract Documents within <br />the time specified, or fails to perform the Work with sufficient labor and equipment or with <br />sufficient materials to insure the prompt completion of said Work, or shall perform the Work <br />unsuitably or shall discontinue the prosecution of the Work for three (3) days, or if the <br />Contractor shall become insolvent, be declared bankrupt, commit any act of bankruptcy or <br />insolvency, allow any final judgment to stand against the Contractor or its affiliated companies <br />unsatisfied for a period of forty-eight (48) hours, make an assignment for the benefit of creditors, <br />or for any other cause whatsoever shall not carry on the Work in an acceptable manner, the <br />Owner may give notice in writing to the Contractor and the Contractor’s sureties of such delay, <br />neglect, or default, specifying the same, and if the Contractor within a period of three (3) days <br />after such notice shall not proceed in good faith and with reasonable speed to correct such <br />delay, neglect, or default in accordance with such notice, the Owner shall have full power and <br />authority, to the extent permitted by law, without violating the Contract Documents, to take the <br />prosecution of the Work out of the hands of the Contractor, to appropriate or use any or all <br />materials and equipment at the Project as may be suitable and acceptable, and may enter into <br />an agreement for the completion of the Work or pursue such other methods as in the Owner's <br />opinion shall be necessary or appropriate for the completion of the Work in an acceptable <br />manner. All costs and charges incurred by the Owner in proceeding in accordance with the <br />preceding sentence, including attorney's fees, and all costs incurred by the Owner in completing <br />the Work shall be deducted from any money due or which becomes due the Contractor. If such <br />costs and expenses incurred by the Owner shall be less than the sum which would have been <br />payable under Contract Documents if it had been completed by the Contractor, then the <br />Contractor shall be entitled to receive the difference, but if such costs and expenses shall <br />exceed the sum which would have been payable under the Contract Documents, the Contractor <br />and the Contractor’s surety shall be liable to the Owner for and shall pay to the Owner the <br />amount of such excess. <br /> <br />ARTICLE 34. TERMINATION OR SUSPENSION BY THE OWNER FOR CONVENIENCE <br /> <br />34.1 The Owner may, without cause, order the Contractor to terminate, suspend, delay, or <br />interrupt the Work in whole or in part for such period of time as the Owner may determine. <br /> <br />34.2 If the Contractor is subsequently ordered by the Owner to resume the Work, any cost or <br />expenses to which the Contractor may be entitled by reason of the suspension, delay, or <br />interruption shall be recovered by means of a Change Order in accordance with Articles 13 and <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: F2D1756F-740F-4E82-9BEB-D1EEF4761E30
The URL can be used to link to this page
Your browser does not support the video tag.