Browse
Search
2021-398-E-IT Dept.-NetPlanner Systems Inc-COVID-19 workforce safety plan
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-398-E-IT Dept.-NetPlanner Systems Inc-COVID-19 workforce safety plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 10:42:20 AM
Creation date
7/21/2021 10:40:17 AM
Metadata
Fields
Template:
Contract
Date
7/13/2021
Contract Starting Date
7/13/2021
Contract Ending Date
7/16/2021
Contract Document Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
36 <br /> <br />Revised NETPLANNER v2 <br /> <br />provided, however that notwithstanding the preceding, if any longer guarantee period is <br />specified for any particular materials or workmanship under the Contract Documents, or under <br />any subcontract, or in connection with any manufactured unit which is installed in the Project, or <br />under the laws of the State of North Carolina, the longer guarantee period shall govern. <br /> <br />18.3 If, within any guarantee period, repairs or changes are required in connection with the <br />Work, which are rendered necessary as the result of the use of materials, equipment, or <br />workmanship which are inferior, defective, or not in accordance with the terms of the Contract <br />Documents, the Contractor shall, promptly upon receipt of notice from the Designer and without <br />expense to the Owner: <br /> <br />a) Completely repair or replace the Work so that it conforms to the Contract Documents; <br /> <br />b) Correct all defects therein; <br /> <br />c) Make good all damage which, in the opinion of the Designer, is the result of the use of <br />materials, equipment, or workmanship which are inferior, defective, or not in accordance with <br />the terms of the Contract Documents; and <br /> <br />d) Make good any Work or material, or any equipment or contents disturbed in fulfilling any such <br />guarantee. <br /> <br />If, in fulfilling the requirements of the Contract Documents or of any guarantee embraced therein <br />or required thereby, the Contractor disturbs any work, facility, premises, or construction <br />belonging to the Owner, the Contractor shall restore such disturbed work to a condition <br />satisfactory to the Owner, and shall guarantee such restored work to the same extent as if it <br />were Work under the Contract Documents. <br /> <br />If the Contractor, after notice, fails to proceed promptly to comply with the terms of the <br />guarantee, the Owner may have the defects corrected, and the Contractor and the Contractor’s <br />ureties shall be liable for all expenses incurred. "Promptly" is defined as within twenty-four (24) <br />hours for systems necessary to normal operation of the building and within seventy-two (72) <br />hours for all other items. All special guarantees applicable to definite parts of the Work that may <br />be shown in or required by Contract Documents shall be subject to the terms of this paragraph <br />during the first year of the life of such special guarantee. Manufacturer's standard guarantees or <br />warranties which do not comply with the time limit specified herein shall be extended by the <br />Contractor automatically without further action on the part of the Owner or the Designer. <br /> <br />18.4 In the eleventh calendar month after the date of Substantial Completion, and at the request <br />of the Owner, the Contractor, the Owner and the Designer shall make an inspection of the Work <br />for the purpose of identifying defective workmanship or materials. If the Contractor, having been <br />requested to do so by the Owner, fails to participate in such inspection, the Contractor shall be <br />conclusively bound by any decision or ruling by the Designer as to any defective workmanship <br />or material and as to the Contractor's responsibility for its repair or replacement. <br /> <br />ARTICLE 19. OWNER'S RIGHT TO DO WORK <br /> <br />19.1 If, during the progress of the Work or during any period of guarantee, the Contractor fails to <br />prosecute the Work properly or to perform any provision of the Contract Documents, the Owner, <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: F2D1756F-740F-4E82-9BEB-D1EEF4761E30
The URL can be used to link to this page
Your browser does not support the video tag.