Browse
Search
2021-398-E-IT Dept.-NetPlanner Systems Inc-COVID-19 workforce safety plan
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-398-E-IT Dept.-NetPlanner Systems Inc-COVID-19 workforce safety plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 10:42:20 AM
Creation date
7/21/2021 10:40:17 AM
Metadata
Fields
Template:
Contract
Date
7/13/2021
Contract Starting Date
7/13/2021
Contract Ending Date
7/16/2021
Contract Document Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />Revised NETPLANNER v2 <br /> <br /> <br /> <br /> <br />ARTICLE 1. DEFINITIONS <br /> <br />1.1 Agreement - The Construction Contract, these General Conditions, and any Supplementary <br />Conditions. <br /> <br />1.2 AIA - The American Institute of Architects. <br /> <br />1.3 ASTM - The American Society for Testing and Materials. <br /> <br />1.4 Beneficial Occupancy – Use of the Project by the Owner after Substantial Completion, but <br />prior to Final Completion.. <br /> <br />1.5 Change Order - A written order to the Contractor signed by the Owner and the Designer <br />authorizing an addition, deletion, or revision in the Work or an adjustment in the Contract Price <br />or the Contract Time issued after execution of the Construction Contract. See paragraph 14.1. <br /> <br />1.6 Completion Date - Those dates identified as Completion Dates in the Contract Construction <br />Schedule or elsewhere in the Contract Documents. <br /> <br />1.7 Construction Contract – The document executed by the Contractor and the Owner to <br />formally memorialize their consent to the terms of the Agreement. <br /> <br />1.8 Construction Change Directive – A written order to the Contractor signed by the Owner and <br />the Designer directing an addition, deletion, or revision in the Work after execution of the <br />Construction Contract, in circumstances when the parties have been unable to agree on an <br />adjustment to the Contract Price or the Contract Time, but the Owner requests that the <br />Contractor proceed with said addition, deletion, or revision in the Work subject to adjustment of <br />the Contract Price or Contract Time under the procedures described herein. <br /> <br />1.9 Construction Manager(s) - The person(s) or firm designated as the Construction Manager in <br />the Contract Documents, or their authorized representatives. The Construction Manager(s), as <br />referred to herein, will be referred to hereinafter as if each were of the singular number and <br />masculine gender. <br /> <br />1.10 Contract Construction Schedule - That schedule described in Article 13 hereof and <br />identified as the Contract Construction Schedule. <br /> <br />1.11 Contract Documents - All of the documents that make up the Agreement, plus the <br />Drawings and Specifications that describe the scope of the Work, plus allowable Modifications <br />to the Contract Documents. <br /> <br />1.12 Contract Price - The total monies payable to the Contractor under the Contract Documents <br />pursuant to paragraph 15.1 of the Agreement. <br /> <br />1.13 Contract Time - The number of calendar days stated in, or computed from, the Contract <br />Documents for the completion of the Work, or any portion thereof. See, particularly, Article 13 <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: F2D1756F-740F-4E82-9BEB-D1EEF4761E30
The URL can be used to link to this page
Your browser does not support the video tag.