Browse
Search
2021-396-E-Solid Waste-UMA-Retaining wall repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-396-E-Solid Waste-UMA-Retaining wall repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 10:26:34 AM
Creation date
7/21/2021 10:25:13 AM
Metadata
Fields
Template:
Contract
Date
7/13/2021
Contract Starting Date
7/13/2021
Contract Ending Date
7/14/2021
Contract Document Type
Agreement
Amount
$29,920.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> <br />Revised 12/18 <br /> <br /> <br />5.5 RISK MANAGEMENT POLICY <br />The Orange County Risk Management Policy shall not apply to construction contracts for <br />amounts over $250,000. The terms of these General Conditions related to insurance shall be <br />the sole authority governing insurance requirements for such contracts. <br /> <br /> <br />ARTICLE 6. OTHER RECORD DOCUMENTS AND SUBMITTALS <br /> <br />6.1 The Designer shall furnish to the Contractor the number of copies of Drawings and <br />Specifications stated in the Contract Documents. Additional copies of Drawings and <br />Specifications may be obtained at the cost of reproduction and handling. <br /> <br />6.2 The Contractor shall submit to the Designer all Submittals required by the Contract <br />Documents. The Contractor shall submit at least three (3) reproducible prints of all shop <br />drawings. The Contractor shall submit samples in quantities required by the Contract <br />Documents. The Contractor shall submit product data in at least five (5) copies. All shop <br />drawings shall be reviewed by the Contractor and shall bear the Contractor's stamp of approval <br />before being forwarded to the Designer. Submittals shall be submitted in such time as to cause <br />no delay to the Work or any part thereof and in accordance with the Contract Construction <br />Schedule and Submittal Register. The Designer shall review the submittal with reasonable <br />promptness, noting desired corrections, if any. The Designer shall retain two (2) copies of the <br />submittal and shall return the balance of the reviewed submittal to the Contractor for action. The <br />Contractor shall furnish any corrected submittal to the Designer. The Designer shall retain two <br />(2) copies of the corrected submittal and will return the balance of the reviewed submittal to the <br />Contractor. All substitutions prior to the receipt of bids shall be in accordance with the Contract <br />Documents. Refer to Instructions to Bidders, Substitutions. <br /> <br />The Contractor acknowledges that the processing of shop drawings and other submittals is <br />directly impacted by the clarity, completeness, and accuracy of said documents and that it is the <br />Contractor’s responsibility to (i) review and coordinate each submittal with all other related or <br />affected Work and (ii) approve each submittal before submitting same to the Designer for <br />approval. <br /> <br />6.3 No substitutions and no deviations from any requirement of the Contract Documents shall <br />be deemed allowed unless the Contractor has specifically informed the Designer and the Owner <br />in writing of such deviations at the time of submittal and the Designer and the Owner have given <br />written and specific approval to the substitutions or deviations. In proposing a deviation or <br />substitution the Contractor warrants to the Owner, notwithstanding any review, allowance or <br />approval by the Designer or the Owner that the deviation or substitution is at least equal to or <br />better in quality and for the purpose intended, and that Contractor shall not by reason of any <br />such review, allowance or approval be relieved from any obligation or responsibility contained in <br />the Contract Documents. <br /> <br />6.4 Review of submittal by the Designer shall not be construed as relieving the Contractor from <br />responsibility for compliance with terms or designs of the Contract Documents nor from <br />responsibility for errors of any sort in the submittal. <br /> <br />DocuSign Envelope ID: B2D44CC3-6321-4EF3-AFC6-547186A1261E
The URL can be used to link to this page
Your browser does not support the video tag.