Orange County NC Website
EXECUTION REQUIREMENTS - 017000 <br />Orange County Waste and Recycling For Proposal – Not for Construction <br />Metal and White Goods Retaining Wall Repair 01 70 00 - 4 <br />DAA PN R00592-204ST2 November 2020 <br />PART 1 GENERAL <br />1.1 SECTION INCLUDES <br />A.Construction Sequence. <br />B.Close out procedures. <br />C.Final Cleaning. <br />D.Adjusting. <br />1.2 CONSTRUCTION SEQUENCE <br />1.Obtain submittal approval and other applicable permits. <br />2. Schedule preconstruction meeting with Owner, Engineer, and necessary <br />personnel. <br />3.Perform wall repair per plans and specifications. <br />4.Schedule final inspection. <br />1.3 CLOSE OUT PRODEDURES <br />A.Submit written certification that Contract Documents have been reviewed, <br />Work has been inspected, and is complete in accordance with Contract <br />Documents and ready for Engineer’s inspection. <br />B.Provide submittals to Engineer that are required by governing or other <br />authorities. <br />C.Submit set of Record Documents indicating changes during construction as <br />required in Section, Submittal Procedures. <br />D.Submit final Application for Payment identifying total adjusted Contract Sum, <br />previous payments, and final amount due. <br />E.Submit the following with final Application for Payment: <br />1.Affidavit of Release of Liens <br />2.Consent of Surety for Final Payment <br />3.Affidavit of Payment of Debts and Claims <br />4.Final Certified Payroll Information <br />F.Submit warranties as required by individual equipment specifications. <br />1.4 FINAL CLEANING <br />DocuSign Envelope ID: B2D44CC3-6321-4EF3-AFC6-547186A1261E