Browse
Search
2021-396-E-Solid Waste-UMA-Retaining wall repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-396-E-Solid Waste-UMA-Retaining wall repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 10:26:34 AM
Creation date
7/21/2021 10:25:13 AM
Metadata
Fields
Template:
Contract
Date
7/13/2021
Contract Starting Date
7/13/2021
Contract Ending Date
7/14/2021
Contract Document Type
Agreement
Amount
$29,920.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRODUCT REQUIREMENTS - 016000 <br />Orange County Waste and Recycling For Proposal – Not for Construction <br />Metals and White Goods Retaining Wall Repair 01 60 00 - 3 <br />DAA PN R00592-204ST2 November 2020 <br />1.7 SUBSTITUTIONS <br />A.Engineer will consider requests for Substitutions only within 30 days after <br />date of Owner-Contractor Agreement. <br />B.Substitutions after receipt of bids will not be allowed for any reason other <br />than a product becoming unavailable. <br />C.Document each request with complete data substantiating compliance of <br />proposed Substitution with Contract Documents. <br />D.Request constitutes a representation that Contractor: <br />1.Has investigated proposed product and determined that it meets or <br />exceeds the quality level of the specified product. <br />2.Shall provide same warranty for Substitution as for specified product. <br />3.Shall coordinate installation and make changes to other Work which <br />may be required for the Work to be complete with no additional costs <br />to Owner. <br />4.Waives claims for additional costs or time extension that may <br />subsequently become apparent. <br />5.Shall reimburse Owner for review or redesign services associated with <br />reapproval by authorities. <br />E.Substitutions will not be considered when they are indicated or implied on <br />shop drawing or product data submittals, without separate written request, <br />or when acceptance will require revision to the Contract Documents. <br />F.Substitution Submittal Procedure: <br />1.Submit three copies of request for Substitution for consideration. Limit <br />each request to one proposed Substitution. <br />2.Submit shop drawings, product data, and certified test results attesting <br />to proposed product equivalence. <br />3.Engineer will notify Contractor, in writing, of decision to accept or reject <br />request. <br />PART 2 PRODUCTS <br />NOT USED <br />PART 3 EXECUTION <br />NOT USED <br />END OF SECTION <br />DocuSign Envelope ID: B2D44CC3-6321-4EF3-AFC6-547186A1261E
The URL can be used to link to this page
Your browser does not support the video tag.