Browse
Search
2021-396-E-Solid Waste-UMA-Retaining wall repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-396-E-Solid Waste-UMA-Retaining wall repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 10:26:34 AM
Creation date
7/21/2021 10:25:13 AM
Metadata
Fields
Template:
Contract
Date
7/13/2021
Contract Starting Date
7/13/2021
Contract Ending Date
7/14/2021
Contract Document Type
Agreement
Amount
$29,920.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALITY CONTROL - 014500 <br />Orange County Waste and Recycling For Proposal – Not for Construction <br />Metal and White Goods Retaining Wall Repair 01 45 00 - 2 <br />DAA PN R00592-204ST2 November 2020 <br />1.06 MANUFACTURER’S FIELD SERVICES AND REPORTS <br />A.When specified in respective Specification Sections, require supplier, <br />manufacturer, or installer, to provide qualified personnel to observe field <br />conditions, conditions of surfaces and installation; quality of workmanship; <br />start-up of equipment; test, adjust, and balance of equipment as <br />applicable; and to make appropriate recommendations. <br />B.Manufacturer's representative shall submit a written report to Engineer <br />listing observations, site decisions, and instructions that are supplemental <br />or contrary to manufacturer's written instructions. The manufacturer's <br />representative shall certify that the materials and/or equipment has been <br />properly installed and is functioning correctly. <br />1.07 TESTING <br />Provide all testing specified in individual Specification Sections. All testing <br />services shall be arranged for and paid by the Contractor unless otherwise <br />indicated in the Contract Documents. <br />1.08 INSPECTION AND TESTING LABORATORY SERVICES FOR CONCRETE <br />AND SOILS <br />A.Where reference is made in the Specifications to tests, inspections, <br />independent designs, etc., such services shall be furnished by the <br />Engineer. All costs for providing such services shall be paid for by the <br />Engineer. <br />B.All arrangements for the testing work shall be made by the Contractor. 48 <br />hour notice is required. Whenever inclement weather does not provide <br />suitable testing conditions, the Contractor shall be responsible for <br />cancellation notice to the testing agency. Any costs incurred because of <br />failure to provide adequate cancellation notice shall be borne by the <br />Contractor. Engineer shall be notified of arrangements made for testing <br />work. <br />C.If a test fails to meet specification requirements, then the area represented <br />by that test shall be reworked and retested at the Contractor’s expense. <br />Any additional testing required to verify previously failing tests shall be at <br />the Contractor’s expense. All corrective measures shall be documented in <br />the Quality Control reports. <br />D.Test reports shall be supplied by the Engineer within 3 days of the <br />completion of such testing. <br />DocuSign Envelope ID: B2D44CC3-6321-4EF3-AFC6-547186A1261E
The URL can be used to link to this page
Your browser does not support the video tag.