Browse
Search
2021-396-E-Solid Waste-UMA-Retaining wall repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-396-E-Solid Waste-UMA-Retaining wall repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 10:26:34 AM
Creation date
7/21/2021 10:25:13 AM
Metadata
Fields
Template:
Contract
Date
7/13/2021
Contract Starting Date
7/13/2021
Contract Ending Date
7/14/2021
Contract Document Type
Agreement
Amount
$29,920.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUBMITTAL PROCEDURES - 013300 <br />Orange County Waste and Recycling For Proposal – Not for Construction <br />Metal and White Goods Retaining Wall Repair 01 33 00 - 5 <br />DAA PN R00592-204ST2 November 2020 <br />provide information unique to this Work in the Shop Drawing <br />submittal. <br />4.Submit the number of copies as follows: <br />a.Products specified by a national standard: Submit three (3) <br />copies. This data is for the general information of the <br />Engineer and for use by the Owner for operation and <br />maintenance and will not be returned to the Contractor. <br />b.Other Products: Submit the number of copies specified for <br />the Shop Drawing. <br />D.Shop Drawing <br />1.Submit the number of copies that Contractor requires, plus three (3) <br />copies that will be retained by Engineer. <br />2.Shop drawings shall consist of drawings, diagrams, illustrations, <br />schedules, performance charts, brochures and other data, prepared <br />specifically for a portion of the Work. Shop Drawings shall indicate <br />the type, size, quantity, arrangement, location, mode of operation, <br />component materials, utility connections, wiring and control <br />diagrams, anchorages, supports, factory applied coatings, and <br />other information necessary to ensure satisfactory fabrication, <br />installation and operation of the completed Work. Shop Drawings <br />shall establish the actual detail of manufactured or fabricated items, <br />indicate proper relation to adjoining work, amplify design details of <br />mechanical and electrical equipment in proper relation to physical <br />spaces in the structure, and incorporate minor changes to design <br />and construction to suit actual requirements. <br />E.Manufacturer’s Installation Procedures <br />1.Submit manufacturers’ installation procedures to Engineer for review <br />in the quantities specified for Shop Drawings. <br />F.Samples <br />1.Submit samples as required by the individual specification sections. <br />Samples shall be physical examples to illustrate the materials and <br />workmanship. Submit in sufficient size and quantity to clearly <br />illustrate the functional characteristics of the Product, with integrally <br />related parts and attachment devices, and the full range of color to <br />be provided. <br />DocuSign Envelope ID: B2D44CC3-6321-4EF3-AFC6-547186A1261E
The URL can be used to link to this page
Your browser does not support the video tag.