Browse
Search
2021-396-E-Solid Waste-UMA-Retaining wall repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-396-E-Solid Waste-UMA-Retaining wall repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 10:26:34 AM
Creation date
7/21/2021 10:25:13 AM
Metadata
Fields
Template:
Contract
Date
7/13/2021
Contract Starting Date
7/13/2021
Contract Ending Date
7/14/2021
Contract Document Type
Agreement
Amount
$29,920.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUBMITTAL PROCEDURES - 013300 <br />Orange County Waste and Recycling For Proposal – Not for Construction <br />Metal and White Goods Retaining Wall Repair 01 33 00 - 3 <br />DAA PN R00592-204ST2 November 2020 <br />6.Indicate submittal dates required for critical shop drawings, product <br />data, samples, and product delivery dates including those furnished <br />by others and items listed under Allowances. <br />7.Indicate specific work sequences and requirements. <br />B.Schedule of Values <br />1.Submit three (3) copies of the schedule of values at least three (3) <br />weeks prior to the first partial payment request. Schedule shall <br />divide the lump sum contract items into major work tasks. Use the <br />table of contents as a guide for itemizing the schedule. Schedule <br />will be used only as a basis for review of the Contractor’s request <br />for payment. <br />2.Engineer may request additional delineation of work tasks and <br />supporting data of the values, as he deems appropriate. Revise <br />schedule and resubmit. <br />3.Revise schedule to list approved Change Orders, with each request <br />for payment. <br />C.Project Record Documents <br />1.Maintain on site, one set of the following record documents; <br />record actual revisions to the Work: <br />a.Contract Drawings <br />b.Contract Documents and Specifications <br />c.Addenda <br />d.Change Orders and other Modifications to the Contract <br />e.Reviewed Submittals <br />2.Store Record Documents separate from documents used for <br />construction. <br />3.Record information concurrent with construction progress. <br />4.Specifications: Legibly mark and record at each Product section <br />description of actual Products installed, including the following: <br />a. Manufacturer’s name, product model and number <br />b.Product substitutions or alternates utilized <br />c.Changes made by Addenda and Modifications <br />DocuSign Envelope ID: B2D44CC3-6321-4EF3-AFC6-547186A1261E
The URL can be used to link to this page
Your browser does not support the video tag.