Orange County NC Website
<br />F O R M OF P R O P O S A L <br /> <br /> Contract: Metal & White Goods Retaining <br />Orange County Solid Waste and Recycling Wall Repair <br />PO Box 8181 Hillsborough, NC 27278 Bidder: <br /> Date: <br />The undersigned, as bidder, hereby declares that the only person or persons interested in this proposal as <br />principal or principals is or are named herein and that no other person than herein mentioned has any interest in <br />this proposal or in the contract to be entered into; that this proposal is made with out connection with any other <br />person, company or parties making a bid or proposal; and that it is in all respects fair and in good faith without <br />collusion or fraud. The bidder further declares that he has examined the site of the work and the contract <br />documents relative thereto, and has read all special provisions furnished prior to the opening of bids; that he has <br />satisfied himself relative to the work to be performed. <br />The Bidder proposes and agrees, if this Proposal is accepted, to contract with the Engineer in the form of contract <br />specified, to furnish all necessary materials, equipment, machinery, tools, apparatus, means of transportation and <br />labor necessary to complete all construction of the subject project in accordance with the Drawings, and <br />Specifications, to the full and entire satisfaction of the Orange County and the Engineer, with a definite <br />understanding that no money will be allowed for extra work Contract Documents or executed change oreder for <br />the sum of: <br />SINGLE PRIME CONTRACT: <br /> <br />Description Unit Estimated <br />Quantity Total Cost <br />Retaining Wall Repair with Helical Piers LS 1 <br /> <br />Items, materials not specifically identified as a unit line item, but nesscessary to complete the project as <br />shown on the plans and in the technical specifications are considered incidental and shall be included <br />in the cost of one of the line items above. Contractor shall determine which line item to include the <br />additional costs based on related items or the sequencing of tasks. <br /> <br />Total Base Bid Price: <br /> <br /> Dollars($) <br />(In Words) <br /> <br /> <br /> <br />Contractor License Number: __________________________ <br /> <br />The bidder further proposes and agrees hereby to commence work under this contract on a date to be specified in a written order of the <br />designer and shall fully complete all work thereunder within the time specified in the General Conditions Article 13. Applicable liquidated <br />damages amount is also stated in the General Conditions Article 13. <br />DocuSign Envelope ID: B2D44CC3-6321-4EF3-AFC6-547186A1261E