Orange County NC Website
EJCDC® C-410, Bid Form for Construction Contract. <br />Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Page 3 of 7 <br />3.03 Unit Cost Items <br />A. MOBILIZATION AND BONDS - This work shall consist of furnishing all necessary insurance, <br />coinsurance, reinsurance, payment/performance bonds, local permits (including payment of <br />permit fees), mobilization of equipment, forces, and personnel for the project. Work shall <br />also consist of furnishing all necessary demobilization of equipment, forces, and personnel <br />for the project. This line item shall be a maximum of 3% of the base bid price. Payment for <br />this line item will be made under a one-time charge and will constitute full compensation for <br />all labor, equipment, tools, and other items necessary and incidental to the completion of <br />this work. Work under this line item will include coordination with and assisting the Engineer <br />with execution and implementation of the CQA plan included in the project documents. <br />B. SURVEYING AND CONSTRUCTION STAKEOUT - This Work shall consist of furnishing all labor, <br />material, equipment, tools and other items necessary and incidental to perform surveying <br />and construction stakeout as dictated by the Contract, including quantity verification, project <br />record documents, and stakeout. Work shall include installing and protecting any necessary <br />benchmarks. Payment for this line item will be made under a one-time charge and will <br />constitute full compensation for all labor, equipment, tools, and other items necessary and <br />incidental to the completion of this work. Final deliverable shall be an asbuilt topographic <br />survey of the landfill cell signed and sealed by a Professional Land Surveyor registered in NC <br />and also include a digital file in .dwg format. <br />C. SEDIMENT AND EROSION CONTROL - This Work shall consist of furnishing all labor, material, <br />equipment, tools and other items necessary and incidental to install and implement the <br />Erosion and Sediment Control plan included in the Contract and Technical Specifications. This <br />item includes maintaining the Erosion and Sediment Controls throughout the project until <br />the site has been released by the Engineer and NCDEQ. Payment for this line item will be <br />made under a one-time charge and will constitute full compensation for all labor, equipment, <br />tools, and other items necessary and incidental to the completion of this work. <br />D. CONSTRUCTION ENTRANCE – This work shall consist of furnishing all labor, material, <br />equipment, tools and other items necessary and incidental to installing, maintain, and <br />remove the temporary construction access into the Phase 2 cell area. Payment for this line <br />item will be made upon a unit rate basis, established by field measurements of access <br />centerline, following final installation. <br />E. ABANDON PIEZOMETER - This work shall consist of furnishing all labor, material, equipment, <br />tools, other items necessary, and incidental to abandoning the existing piezometer shown <br />on drawing C4.0. Piezometer shall be abandoned by a licensed well contractor, with <br />documentation of proper well abandonment provided to the Engineer. Payment for this line <br />item will be made upon a lump sum basis, established in the bid form, following Engineer <br />confirmation of abandonment and receipt of the abandonment report from the licensed well <br />contractor. <br />F. EXCAVATE TO BASE GRADES – This work shall consist of furnishing all labor, material, <br />equipment, tools and other items necessary and incidental to excavating material from the <br />Phase 2 cell area for the purpose of establishing base grades. Excess soil shall be stockpiled <br />at the identified soil stockpile locations as shown on the drawings, unless otherwise directed <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED