EJCDC® C-410, Bid Form for Construction Contract. <br />Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Page 2 of 7 <br />ARTICLE 3—BASIS OF BID—UNIT PRICES <br />3.01 Unit Price Bids <br />A. Bidder will perform the following Work at the indicated unit prices: <br />Item <br />No. <br />Description Unit Estimated <br />Quantity <br />Bid Unit Price Bid Amount <br />1 Mobilization and Bonds LS 1 $ <br />2 Surveying and Construction Stakeout LS 1 $ <br />3 Erosion and Sediment Control LS 1 $ <br />4 Cell Gravel Access Ramp/Road SY 275 $ <br />5 Abandon Piezometer LS 1 $ <br />6 Excavate to Base Grades CY 10,500 $ <br />7 Structural Fill Placement CY 1,200 $ <br />8 15-Inch RCP (Temp. Culvert) LF 90 $ <br />9 24-Inch RCP (Culvert 2) LF 72 $ <br />10 Permanent Seeding and Stabilization LS 1 $ <br />Total of All Unit Price Bid Items $ <br />B. Bidder acknowledges that: <br />1. each Bid Unit Price includes an amount considered by Bidder to be adequate to cover <br />Contractor’s overhead and profit for each separately identified item, and <br />2. estimated quantities are not guaranteed, and are solely for the purpose of comparison of <br />Bids, and final payment for all Unit Price Work will be based on actual quantities, <br />determined as provided in the Contract Documents. <br />3. Items not specifically identified as a unit line item, but necessary to complete the project <br />as shown on the plans and in the technical specifications shall be included in the cost of <br />one of the line items above. Contractor shall determine which line item to include the <br />additional costs based on related items or the sequencing of tasks. <br />3.02 Unit Cost Schedule Measurement and Basis for Payment <br />A. The line items below provide further description of the unit cost items included in the project <br />bid price and shall be used as a means of determining the value of Work added to or deleted <br />from the Contract. The Unit Cost generally outlines each item and the corresponding unit <br />price listed by the Contractor. The price associated with each item shall be the full <br />compensation paid for the Work described, regardless of the items. The description of the <br />item shall not limit or lessen the work associated with each item as called for in the plans and <br />specifications. <br />B. The Contractor shall provide quantity justification with pay requests for items paid on a unit <br />rate basis. Quantities for unit price bid items shall be calculated based on the measurement. <br />The Engineer reserves the right to make final decision regarding those quantities. <br />Bid No 367-OC5320: Orange County Solid Waste Eubanks Road C&D Landfill Permit No 68-04 <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED