Orange County NC Website
EJCDC® C-200, Instructions to Bidders for Construction Contract. <br />Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Page 10 of 11 <br />ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE <br />17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner <br />may, in its sole discretion, release any Bid and return the Bid security prior to the end of this <br />period. <br />ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT <br />18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, <br />nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor <br />Bid informalities not involving price, time, or changes in the Work. <br />18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, <br />to not be responsible. <br />18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the <br />Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of <br />the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then <br />Owner will reject the Bid as nonresponsive. <br />18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder <br />submitting the lowest responsive Bid. <br />18.05 Evaluation of Bids <br />A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed <br />requirements, and such alternates, unit prices, and other data, as may be requested in the <br />Bid Form or prior to the Notice of Award. <br />B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids <br />will be compared on the basis of the total of the products of the estimated quantity of each <br />item and unit price Bid for that item, together with any lump sum items. <br />18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder <br />and may consider the qualifications and experience of Subcontractors and Suppliers proposed for <br />those portions of the Work for which the identity of Subcontractors and Suppliers must be <br />submitted as provided in the Bidding Documents. <br />18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, <br />qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers. <br />ARTICLE 19—BONDS AND INSURANCE <br />19.01 Article 4 of the General Conditions, as may be modified by any Supplementary Conditions, sets <br />forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED