Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Eubanks Road C&D Landfill <br />Construction Quality Assurance Plan <br />Revised March 15, 2021 <br /> <br /> <br />the layer is a minimum of 12 inches thick. Partial surveys may be accepted at <br />the discretion of the QAE. <br /> <br /> 4) Surface Features <br /> <br />Provide the horizontal limits of the top of the topsoil layer. Provide grid <br />locations that indicate the completed elevations of the soil cap. Grid locations <br />shall be horizontally the same as the grid locations used for base grades. <br /> <br />Additionally, provide record drawing after completion of the project that <br />includes, but may not be limited to, the following items. <br /> <br />• diversion berms <br />• drainage channels <br />• culverts (with inverts) <br />• manholes <br />• water lines and valves <br />• hydrants <br />• sewer lines <br />• landfill gas vents/landfill gas wells <br />• landfill gas monitoring probes <br />• roads <br />• structures <br />• ponds <br />• riprap aprons and outlets <br />• concrete pads <br />• utility poles <br />• cleanouts <br /> <br /> 5) Tolerances <br /> <br />Tolerances for the various components surveyed for the cap system shall be: <br /> <br />• base grades: 0 to -0.2 feet <br />• top of vegetative layer: 2.0 +0.2 feet from top of soil cap <br />• piping: +0.1 feet provided required slopes are <br /> maintained <br />• all other components ±0.2 feet <br /> <br />These tolerances are allowable provided the required slopes and material thicknesses <br />are maintained. Tolerances for piping shall be +0.1 feet. <br /> <br />e. Construction Staking <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.