Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Eubanks Road C&D Landfill <br />Construction Quality Assurance Plan <br />Revised March 15, 2021 <br /> <br /> <br />obtained at significant grade breaks. The contour interval shall be 2 feet. The <br />scale of the drawing shall be no greater than 1 inch = 50 feet. <br /> <br />a) Thickness Verification Table <br /> <br />Thickness verification tables will be generated for the base grade. All <br />thicknesses shall be measure perpendicular to the base slope. <br /> <br />2) Cap <br /> <br />Provide the elevations of the area to be capped prior to placement of cap <br />materials. The record drawing shall indicate the conditions of the site after <br />vegetation has been stripped from the closure area and the surface prepared <br />and ready for placement of the infiltration barrier layer. Provide grid <br />locations that indicate the elevations of the base grades on a maximum 50- <br />foot grid. On slopes, at a minimum the survey points will include top of slope, <br />midpoint, and toe of slope. Survey points shall be obtained at significant grade <br />breaks. The contour interval shall be 2 feet. The scale of the drawing shall be <br />no greater than 1 inch = 50 feet. <br /> <br />a) Thickness Verification Table <br /> <br />Thickness verification tables will be generated for the 6-ich topsoil finished <br />grade, 12-inch controlled subgrade and 18-inch infiltration layer. All <br />thicknesses shall be measure perpendicular to the base slope. <br /> <br />3) Infiltration Layer <br /> <br />Provide the horizontal limits of the top of the infiltration layer. Provide grid <br />locations that indicate the completed elevations of the soil cap. Grid locations <br />shall be horizontally the same as the grid locations used for base grades. No <br />additional soil layers shall be placed until a certified survey is submitted and <br />approved by the QAE demonstrating that the surface of the infiltration layer <br />conforms to the Contract Documents and that the layer is a minimum of 18 <br />inches thick. Partial surveys may be accepted at the discretion of the QAE. <br /> <br /> <br />3) Erosion/Vegetative Support Layer <br /> <br />Provide the horizontal limits of the top of the erosion/vegetative support layer. <br />Provide grid locations that indicate the completed elevations of the soil cap. <br />Grid locations shall be horizontally the same as the grid locations used for base <br />grades. No additional soil layers shall be placed until a certified survey is <br />submitted and approved by the QAE demonstrating that the surface of the <br />erosion/vegetative support layer conforms to the Contract Documents and that <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.