Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Eubanks Road C&D Landfill <br />Construction Quality Assurance Plan <br />Revised March 15, 2021 <br /> <br /> <br />E. DOCUMENTATION <br /> <br />1. Field Documentation <br /> <br />a. Logs will be prepared by the QAO presenting detailed descriptions of construction <br />events. Logs shall include, but are not limited to: <br /> <br />1) Date, project name, location, and other identification <br />2) Unique sheet numbering for document control <br />3) Reports on meetings held and their results <br />4) Construction operation and their locations. <br />5) Operations and locations of Quality Control personnel. <br />6) QC tests performed, their designation and location. <br />7) Description of off-site materials received, including quality verification <br />(vendor certification) documentation. <br />8) Locations and designations of samples obtained. <br />9) Meteorological data and conditions. <br />10) Decisions made regarding approval of unit of material or of work, and/or <br />corrective actions to be taken in instances of substandard quality <br />11) Unique identifying sheet numbers of inspection data sheets and/or <br />problem reporting and corrective measures reports used to substantiate the <br />decisions described in the preceding item. <br />12) General comments and observations. <br /> <br />b. A copy of logs shall be kept on site and made available to the Owner, Engineer, and <br />QAE. <br /> <br />c. Field and laboratory test data shall be identified and maintained in an easily referenced <br />manner on the site. <br /> <br />d. Corrective measures taken to bring the unsuitable work into conformance with the <br />design specifications must be documented. This documentation shall describe the <br />non-conformity, the exact location (both horizontal and vertical extent), test <br />designations indicating non-conformity, the corrective active agreed upon, and test <br />results indicating the remedial action is acceptable. <br /> <br />e. Photographic reports shall also be maintained. These photographs will serve as a <br />pictorial record of work progress, problems, and corrective measures. They will be <br />kept in a permanent protective file in the order in which they were taken. <br /> <br /> <br /> <br /> <br />2. Record Drawings <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.