Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Eubanks Road C&D Landfill <br />Construction Quality Assurance Plan <br />Revised March 15, 2021 <br /> <br /> <br /> <br />a. The QAO shall inspect the embankment foundation to verify that an appropriate <br />subgrade is established for embankment construction. This may include the <br />placement and compaction of fill. (Section 02200). The QAO shall observe and <br />verify embankment construction to include the following: <br /> <br />1) Observations of soil and rock surfaces for adequate filling of rock joints, clay <br />fractures, or depressions, and removal and filling of sand seams. <br /> <br />2) Measurements of the depth and slope of the excavation or fill to verify that it <br />meets design requirements. Document measurements. <br /> <br />3) Observations to verify proper placement of recessed areas for collection pipes. <br /> <br />4) Observations to verify the quality of compacted fill. Verify that testing is <br />performed in accordance with the specifications. Tabulate testing results. <br />Include tabulation and testing results in the final QA report. <br /> <br />5) Observations of stripping and excavation to verify that there are no moisture <br />seeps and that soft, organic, and otherwise undesirable materials are removed. <br />Proof-rolling with heavy equipment can be used to detect soft areas likely to <br />cause settlement. <br /> <br />6) Observation and documentation of type of compaction equipment, number of <br />passes, and uniformity of compaction coverage. <br /> <br />7) Measurement of loose lift thickness. <br /> <br />8) Observation of material type, texture, color, and moisture content as placed. <br /> <br />9) Observation of scarification and connection between compacted fill lifts. <br /> <br />b. In general, observations shall be documented in the logs maintained by the QAO. <br /> <br /> <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.