Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Eubanks Road C&D Landfill <br />Construction Quality Assurance Plan <br />Revised March 15, 2021 <br /> <br /> <br />Infiltration Barrier Layer Test Pad <br /> <br />Test ASTM Designation or <br />Other Test Method Frequency <br />Compacted Density D2922, D1556, or <br />D2937 <br />5 per lift <br />Compacted Moisture Content D3017 or D2216 5 per lift <br />Hydraulic Conductivity (Shelby Tube) D5084 1 per acre per lift <br />Backfill Placement Observation Continuous <br />Notes: <br />a. Every fifth sample tested with ASTM D2922 shall be verified by ASTM D1556, Sand <br />Cone or ASTM D2937, Drive Cylinder). <br /> <br />b. Every fifth sample tested with ASTM D3017 shall be verified with ASTM D2216, <br />Laboratory Determination of Water Content of Soil, Rock, and Soil-Aggregate Mixtures. <br /> <br />c. Test locations shall be identified by the Contractor by horizontal and vertical control and <br />presented on drawing or sketch indicating dimensions. <br /> <br />d. If a test fails to meet the required compaction level or moisture content, then the area <br />represented by that test shall be reworked and retested at the Contractor's expense. <br />Corrective measures shall be documented in the Quality Control and Quality Assurance <br />reports. <br /> <br />e. The Contractor shall plug test locations with a 50% cap soil, 50% bentonite mixture <br />compacted in 2" lifts to control leakage. <br />3. Quality Assurance Observations <br /> <br />a. Soil Foundation <br /> <br />The QAO shall include verification that an appropriate subgrade is established for subsequent <br />layer placement. This may include the placement and compaction of controlled fill (Section <br />02200). The verification shall include the following: <br /> <br /> 1) Observations of soil and rock surfaces for adequate filling of rock joints, clay <br />fractures, or depressions, and removal and filling of sand seams. Shall <br />document in written form and photographs the condition of the subgrade prior <br />to placement of subsequent layers. <br /> <br /> 2) Measurements of the depth and slope of the excavation or fill to verify that it <br />meets design requirements. Shall document the depths of structural fill placed. <br /> <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.