Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Eubanks Road C&D Landfill <br />Construction Quality Assurance Plan <br />Revised March 15, 2021 <br /> <br /> <br /> <br /> 7) Reviewing methods for documenting and reporting inspection data. <br /> <br /> 8) Reviewing methods for distributing and storing documents and reports. <br /> <br /> 9) Reviewing work area security and safety protocol. <br /> <br /> 10) Discussing procedures for the location and protection of construction <br />materials and for the prevention of damage of the materials from inclement <br />weather or other adverse events. <br /> <br /> 11) Conducting a site walk-over to review construction material and inspection <br />equipment storage locations. <br /> <br />The QA personnel shall document the Preconstruction Meeting. Copies of the <br />documentation will be forwarded to each organization. <br /> <br />b. Progress Meetings <br /> <br />Progress Meetings will be held at least every other week at the work area, unless otherwise <br />directed by the Owner. Attending the meeting will be the Contractor, the Engineer, and the <br />QA Personnel. The purpose of the meeting is to: <br /> <br /> 1) Review the previous week's activities and accomplishments. <br /> <br /> 2) Review the work location and activities for the upcoming week. <br /> <br /> 3) Identify the Contractor's personnel and equipment assignments for the <br />upcoming week. <br /> <br /> 4) Discuss potential construction problems. <br /> <br />The QA personnel shall document the Progress Meetings. Copies of the <br />documentation will be forwarded to each organization. <br /> <br />c. Problem or Work Deficiency Meetings <br /> <br />If a problem or deficiency is present, or likely to occur, a special meeting will be held. This <br />meeting will be attended by the Contractor, the Owner, the QA Personnel, and the Engineer, <br />if necessary. <br /> <br />The purpose of the meeting will be to define and resolve the problem or problems, or recurring <br />work deficiency, in the following manner: <br /> <br /> 1) Define and discuss the problem or deficiency. <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.