Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Eubanks Road C&D Landfill <br />Construction Quality Assurance Plan <br />Revised March 15, 2021 <br /> <br /> <br />4. Related Requirements <br /> <br />Section 01560 Erosion and Sediment Control <br />Section 01580 Project Coordination <br />Section 01720 Project Record Documents <br />Section 02110 Sitework Procedures <br />Section 02200 Earthwork <br />Section 02209 Erosion/Vegetative Support Layer (Cap Soil Cushion) <br />Section 02221 Trenching, Backfilling and Compacting <br />Section 02292 Infiltration Barrier Layer (Compacted Soil Cap) <br />Section 02420 Surface Runoff Collection System <br />Section 02480 Landfill Seeding <br />Section 13320 Landfill Gas Vents <br />Section 13322 Landfill Gas Detection Probes <br />Section 15060 Pipe and Pipe Fittings <br /> <br /> <br />5. Key Personnel <br /> <br />The organizations involved in the project include the: 1) Owner and Operator, Orange County Solid <br />Waste Management Department, 2) North Carolina Department of Environmental Quality (NCDEQ), <br />3) Design Engineer, Draper Aden Associates, and 4) QA Personnel, Contractors and Subcontractors. <br />Responsibilities of these principal organizations are described below. <br /> <br />a. North Carolina Department of Environmental Quality <br /> <br />It is the responsibility of the North Carolina Department of Environmental Quality (NCDEQ) <br />to review the permit amendment application, including this QA plan, for compliance with the <br />Rules of the North Carolina Administrative Code and the United States Environmental <br />Protection Agency. The NCDEQ will issue a permit amendment for the facility upon <br />completion of the review and necessary revisions to comply with the regulations. <br /> <br />Prior to acceptance of wastes in the facility, the Owner shall submit to the NCDEQ a <br />certification from a professional engineer that the facility has been constructed in accordance <br />with the approved plans and specifications. <br /> <br />b. Orange County Solid Waste Management Department <br /> <br />1) The Orange County Solid Waste Management Department - Orange County, <br />North Carolina, the Owner and Operator, is responsible for the design, <br />construction, operation, and closure of the permitted facility. The Owner has <br />ultimate responsibility for complying with the regulations of the NCDEQ and <br />assuring that the landfill has been constructed in accordance with the plans <br />and specifications. This assurance is through the Quality Assurance Plan and <br />subsequent documentation. <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.