Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Eubanks Road C&D Landfill <br />Construction Quality Assurance Plan <br />Revised March 15, 2021 <br /> <br /> <br />• Accountability of QC personnel. The QA program will require <br />accountability of QC personnel by means of "signing off" on test <br />sections and repaired sections. <br /> <br />3. Quality Control <br /> <br />a. A QC program shall be maintained for Project construction activities. The Quality <br />Control Officer (QCO) shall be on site as required for representative testing. The <br />QCO shall be responsible for the implementation of the quality control program. <br />b. The QC program shall consist of construction and administrative activities related to <br />the Project to control the overall quality of the Project. Quality shall be defined as the <br />level of effort, materials, means or methods used which meet the minimum <br />requirements as specified in the Project Documents. Administrative items included <br />in the QC program include project schedules, project submittals, schedule of values, <br />field logs, and record drawings and surveys. <br />c. Minimum testing requirements are included in applicable specification sections. Tests <br />that fail to comply with the minimum requirements shall be retested at the Contractor's <br />expense. The Owner reserves the right to direct additional testing and sampling. <br />d. A qualified testing laboratory shall perform soils testing. Laboratory shall obtain <br />certificate of calibration in accordance with ASTM E-4 or National Institute for <br />Science and Technology (NIST) Handbook 44 standards for equipment used for soils <br />testing. A soils testing laboratory representative shall be present on site during fill and <br />backfilling operations that require quality control testing. <br />e. A qualified testing laboratory shall perform geosynthetics testing. Laboratory shall <br />obtain certification by the Geosynthetics Accreditation Institute-Lab Accreditation <br />Program (GAI-LAP) by the Geosynthetic Institute (GSI) for appropriate <br />geosynthetics testing procedures and machinery. <br />f. Results of analysis shall be submitted to the Engineer as soon as they are available. <br />Should the analyses show that the product tested does not comply with the <br />specifications, the Contractor shall remove, repair or replace the product at no expense <br />to the Owner. The Contractor may, at his option and expense, perform additional <br />testing to substantiate the claim that the product complies with the specification <br />requirements. <br /> <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.