Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Eubanks Road C&D Landfill <br />Permit Technical Specifications <br />Revised March 15, 2021 <br />Section 15060 - 3 <br /> <br /> <br />ends of each pipe, and the outside of the plain end and the inside of the bell shall be <br />wiped clean and dry and be free from dirt, sand, grit, or foreign material before the <br />pipe is laid. <br /> <br /> D. Pipe Cleanliness <br /> <br /> Foreign material shall be kept from entering the pipe while it is being placed in the <br />trench. During pipe laying operations, no debris, tools, clothing, or other materials <br />shall be placed in the pipe. <br /> <br /> E. Pipe Placement <br /> <br /> As each length of pipe is placed in the trench, the joint shall be assembled and the pipe <br />brought to correct line and grade. The pipe shall be secured in place with approved <br />backfill material. <br /> <br /> F. Pipe Deflection <br /> <br /> When it is necessary to deflect pipe from a straight line in either the vertical or <br />horizontal plane, or where long radius curves are permitted, the amount of deflection <br />shall not exceed manufacturer's recommendations. <br /> <br /> G. Pipe Cutting <br /> <br /> Cutting pipe for the insertion of valves, fittings, or closure pieces shall be done in a <br />neat, workmanlike manner without creating damage to the pipe or lining. <br /> <br /> H. Pipe Bedding <br /> <br /> Pipe bedding shall be in accordance with Section 02221. <br /> <br /> I. Backfill <br /> <br /> Backfill shall be in accordance with Section 02221. <br /> <br />3.02. Pipe Testing <br /> <br />No testing of reinforced concrete pipe is required. <br /> <br />END OF SECTION <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.