Orange County NC Website
Orange County Eubanks Road C&D Landfill <br />Permit Technical Specifications <br />Revised March 15, 2021 <br />Section 13302 - 7 <br /> <br /> <br />M. Cleaning <br /> <br /> Perform cleaning during installation of the work and upon completion of the work. <br />Remove from site excess materials, debris, and equipment. <br /> <br /> <br />Part 4 Maintenance <br /> <br />4.01. Begin maintenance immediately after seeding. <br /> <br />4.02. Maintenance shall include, but not be limited to proper watering, refilling of rainwashed <br />gullies and rutted areas, refertilizing, mowing, liming, disease and insect pest control, <br />aerating, protective spraying, and other procedure consistent with good horticultural <br />practice necessary to establish normal, vigorous, healthy growth. <br /> <br />4.03. Ample soil moisture must be maintained during this period. A thorough watering to a <br />minimum depth of 4” once every 3-5 consecutive calendar days, depending upon soil type <br />and drainage shall be accomplished to maintain ample soil moisture during the growing <br />season. <br /> <br />4.04. The CONTRACTOR shall maintain seeded areas until final acceptance of the project and <br />shall restore or replace any portion of the seeding work that is found defective or which <br />becomes damaged prior to final acceptance. If winter or summer crops are planted, they <br />must be maintained until spring or fall seeding schedules can be met. The CONTRACTOR <br />will be responsible for planting, maintaining the temporary cover, eradicating the <br />temporary cover crop by tilling and grading prior to spring or fall seeding seasons, and <br />replanting the project based on the spring or fall planting selections, whichever comes first. <br />The CONTRACTOR shall perform supplemental seeding when less than a 90% uniform <br />stand of permanent grass is obtained. Restoration or replacement work shall include the <br />re-establishment of the grade or profile of the area, replacement of topsoil, refertilization, <br />reseeding or remulching as directed by the CQA Engineer. Maintenance must be <br />performed by the CONTRACTOR until the final acceptance of the spring or fall season <br />grass is accomplished. There is no time limit in force. <br /> <br />Part 5 Inspection and Acceptance <br /> <br />5.01 In the event a summer or winter cover crop is required, an inspection will take place to <br />verfiy that the cover crop has provided a 90% uniform stand of cover. Following the <br />maintenance of the cover, eradication by tilling, and reseeding based on the season, a <br />substantial inspection will be accomplished by the QAO. If a cover crop is not necessary, <br />a substantial inspection can be performed by the QAO once the permanent seeding has <br />germinated and provided a 90% uniform stand of grass. <br /> <br />5.02 Once corrections are complete, another inspection will be conducted by the QAO. Upon <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED