Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Eubanks Road C&D Landfill <br />Permit Technical Specifications <br />Revised March 15, 2021 <br />Section 13302 - 5 <br /> <br /> <br />seed mixture shall be applied as soon as possible after the area is brought to final grade <br />as per the plans. No seeding shall occur between November 16th and February 1st <br />unless so approved by the COUNTY. <br /> <br />B. The area to be seeded shall be prepared by removing large ruts or surface depressions <br />and by breaking up the surface of the soil. The soil shall be tested and lime, fertilizer, <br />and, if necessary, inoculate bacteria shall be incorporated into the top soil. <br /> <br />C. Areas which fail to establish adequate vegetative cover will be re-seeded as soon as <br />such areas are identified. <br /> <br />3.04. Application of Materials <br /> <br />A. In general, materials shall be applied by hand or equipment. If hydroseeding is used, <br />mixing shall be done at the job site and care shall be exercised to avoid damaging the <br />seeds during mixing or application. <br /> <br />B. Notify QAO at least seven working days prior to start of seeding operations. <br /> <br />C. Preparation <br /> <br />1. After areas required to be seeded have been brought to the required grade, <br />thoroughly till to a minimum depth of 2 inches by scarifying, disking, <br />harrowing, or other approved method. Remove debris and stone larger than <br />one inch remaining on the surface after tilling. Tilling will be necessary <br />prior to seeding as well as when the summer or winter species must be <br />eradicated. <br /> <br />2. Limit preparation to areas which will be immediately seeded. <br /> <br />D. Topsoil/Organically Amended Soil <br /> <br />Areas shall have topsoil (or an approved organically amended soil) uniformly <br />distributed and evenly spread to a thickness of not less than six (6) inches. <br /> <br />E. Lime <br /> <br />Apply the rate and amount of lime necessary to maintain the areas at a pH level of <br />6 to 6.8. Soil analysis report of existing conditions and pH level will designate the <br />amount of lime necessary to bring the soil to the acceptable levels. <br />F. Fine Grade <br /> <br />Fine grade seed areas to smooth, even surface with loose, uniformly fine texture. <br />Roll, rake, and drag areas, remove ridges and fill depressions, as required to meet <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.