Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Eubanks Road C&D Landfill <br />Permit Technical Specifications <br />Revised March 15, 2021 <br />Section 13302 - 4 <br /> <br /> <br />Part 3 Execution <br /> <br />3.01. Delivery, Storage, and Handling <br /> <br /> <br /> A. Fertilizer and Lime <br /> <br /> Deliver materials to the site in the original, unopened containers showing the <br />weight, chemical analysis, and manufacturer’s name. In lieu of containers, bulk <br />fertilizer and lime can be used only if appropriate certificates accompany each <br />delivery. <br /> <br /> B. Seed <br /> <br /> Deliver seed to the site in original sealed packages bearing the producer’s <br />guaranteed analysis for percentages of mixtures, purity, germination, weed content, <br />and inert material. Wet, moldy, outdated, or otherwise damaged seed will be <br />rejected. <br /> <br /> C. Storage and Handling <br /> <br /> Store lime, fertilizer, and seed in dry locations away from contaminants. Protect <br />seed from drying out. When handling materials, do not drop or dump from vehicles. <br /> <br />3.02. Temporary Seeded Areas <br /> <br />A. Areas designated on the plans as requiring temporary seeding and areas of the site not <br />to be constructed within 15 consecutive calendar days of final grading shall be seeded <br />as soon as possible after the disturbance in the area is completed. The temporary <br />seeding shall be in accordance with the of the North Carolina Erosion and Sediment <br />Control Planning and Design Manual. <br /> <br />B. Prior to seeding, the surface of the area to be seeded shall be prepared by removing <br />depressions and ruts. Care shall be taken to avoid compaction of the surface. The <br />area shall be prepared by breaking up the surface of the soil. <br /> <br />C. Areas which fail to establish adequate vegetative cover adequate to limit rill erosion <br />will be reseeded as soon as such areas are identified. <br /> <br />3.03. Permanent Seeded Areas <br /> <br />A. Permanent seeding shall be accomplished on final grades, on cut and fill slopes, on <br />access roads, surface water diversion ditches, rough-graded areas that will not be <br />brought to final grade for a year or more and other areas as required. The required <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.