Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 017700 - CLOSEOUT PROCEDURES <br />Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 017700 - 5/5 <br />B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each <br />surface or unit to condition expected in an average commercial building cleaning and <br />maintenance program. Comply with manufacturer's written instructions. <br />1. Complete the following cleaning operations before requesting inspection for <br />certification of Substantial Completion for entire Project or for a designated portion of <br />Project: <br />a. Clean Project site of rubbish, waste material, litter, and other foreign substances. <br />b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other <br />foreign deposits. <br />c. Rake grounds that are not planted, mulched, or paved to a smooth, even-textured <br />surface. <br />d. Remove tools, construction equipment, machinery, and surplus material from <br />Project site. <br />e. Leave Project clean and ready for occupancy. <br />C. Construction Waste Disposal: Comply with waste-disposal requirements in Section 015000 <br />"Temporary Facilities and Controls." <br />3.2 REPAIR OF THE WORK <br />A. Complete repair and restoration operations required by Section 017300 "Execution" before <br />requesting inspection for determination of Substantial Completion. <br />END OF SECTION 017700 <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.