Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 017300 - EXECUTION <br />Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 017300 - 7/9 <br />B. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged <br />during installation or cutting and patching operations, by methods and with materials so as not <br />to void existing warranties. <br />C. Temporary Support: Provide temporary support of Work to be cut. <br />D. Protection: Protect in-place construction during cutting and patching to prevent damage. <br />Provide protection from adverse weather conditions for portions of Project that might be <br />exposed during cutting and patching operations. <br />E. Adjacent Occupied Areas: Where interference with use of adjoining areas or interruption of <br />free passage to adjoining areas is unavoidable, coordinate cutting and patching in accordance <br />with requirements in Section 011000 "Summary." <br />F. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems <br />are required to be removed, relocated, or abandoned, bypass such services/systems before <br />cutting to minimize interruption to occupied areas. <br />G. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar <br />operations, including excavation, using methods least likely to damage elements retained or <br />adjoining construction. If possible, review proposed procedures with original Installer; comply <br />with original Installer's written recommendations. <br />1. In general, use hand or small power tools designed for sawing and grinding, not <br />hammering and chopping. Cut holes and slots neatly to minimum size required, and with <br />minimum disturbance of adjacent surfaces. Temporarily cover openings when not in <br />use. <br />2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces. <br />3. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a <br />diamond-core drill. <br />4. Excavating and Backfilling: Comply with requirements in applicable Sections where <br />required by cutting and patching operations. <br />5. Proceed with patching after construction operations requiring cutting are complete. <br />H. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations <br />following performance of other Work. Patch with durable seams that are as invisible as <br />practicable, as judged by Engineer. Provide materials and comply with installation <br />requirements specified in other Sections, where applicable. <br />1. Inspection: Where feasible, test and inspect patched areas after completion to <br />demonstrate physical integrity of installation. <br />2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish <br />restoration into retained adjoining construction in a manner that will eliminate evidence <br />of patching and refinishing. <br />a. Clean piping, conduit, and similar features before applying paint or other finishing <br />materials. <br />b. Restore damaged pipe covering to its original condition. <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.