Orange County NC Website
SECTION 017300 - EXECUTION <br />Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 017300 - 3/9 <br />1. If identical materials are unavailable or cannot be used, use materials that, when <br />installed, will provide a match acceptable to Engineer for the visual and functional <br />performance of in-place materials. Use materials that are not considered hazardous. <br />C. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or <br />fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially <br />hazardous to health or property or that might damage finished surfaces. <br />1. Use cleaning products that comply with Green Seal's GS-37, or if GS-37 is not applicable, <br />use products that comply with the California Code of Regulations maximum allowable <br />VOC levels. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Existing Conditions: The existence and location of underground and other utilities and <br />construction indicated as existing are not guaranteed. Before beginning sitework, investigate <br />and verify the existence and location of underground utilities, and other construction affecting <br />the Work. <br />1. Before construction, verify the location and invert elevation at points of connection of <br />sanitary sewer, storm sewer, gas service piping, and water-service piping; underground <br />electrical services; and other utilities. <br />2. Furnish location data for work related to Project that must be performed by public <br />utilities serving Project site. <br />B. Examination and Acceptance of Conditions: Before proceeding with each component of the <br />Work, examine substrates, areas, and conditions, with Installer or Applicator present where <br />indicated, for compliance with requirements for installation tolerances and other conditions <br />affecting performance. Record observations. <br />1. Examine roughing-in for mechanical and electrical systems to verify actual locations of <br />connections before equipment and fixture installation. <br />2. Examine walls, floors, and roofs for suitable conditions where products and systems are <br />to be installed. <br />3. Verify compatibility with and suitability of substrates, including compatibility with <br />existing finishes or primers. <br />C. Written Report: Where a written report listing conditions detrimental to performance of the <br />Work is required by other Sections, include the following: <br />1. Description of the Work, including Specification Section number and paragraph, and <br />Drawing sheet number and detail, where applicable. <br />2. List of detrimental conditions, including substrates. <br />3. List of unacceptable installation tolerances. <br />4. Recommended corrections. <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED