Orange County NC Website
Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 017300 - 1/9 <br />SECTION 017300 - EXECUTION <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes general administrative and procedural requirements governing execution of <br />the Work, including, but not limited to, the following: <br />1. Construction layout. <br />2. Field engineering and surveying. <br />3. Installation of the Work. <br />4. Cutting and patching. <br />5. Coordination of Owner's portion of the Work. <br />6. Coordination of Owner-installed products. <br />7. Progress cleaning. <br />8. Starting and adjusting. <br />9. Protection of installed construction. <br />B. Related Requirements: <br />1. Section 013300 "Submittal Procedures" for submitting surveys. <br />2. Section 017700 "Closeout Procedures" for submitting final property survey with Project <br />Record Documents, recording of Owner-accepted deviations from indicated lines and <br />levels, replacing defective work, and final cleaning. <br />1.3 DEFINITIONS <br />A. Cutting: Removal of in-place construction necessary to permit installation or performance of <br />subsequent work. <br />B. Patching: Fitting and repair work required to restore construction to original conditions after <br />installation of subsequent work. <br />1.4 PRECONSTRUCTION MEETING <br />A. Prior to beginning work, a preconstruction conference shall be held at the Project Site. <br />Contractor’s superintendent, Engineer, and Owner shall be in attendance. <br />1.5 INFORMATIONAL SUBMITTALS <br />A. Qualification Data: For land surveyor. <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED