Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS <br />Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 015000 - 6/6 <br />3.6 OPERATION, TERMINATION, AND REMOVAL <br />A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and <br />abuse, limit availability of temporary facilities to essential and intended uses. <br />B. Maintenance: Maintain facilities in good operating condition until removal. <br />1. Maintain operation of temporary enclosures, heating, cooling, humidity control, <br />ventilation, and similar facilities on a 24-hour basis where required to achieve indicated <br />results and to avoid possibility of damage. <br />C. Temporary Facility Changeover: Do not change over from using temporary security and <br />protection facilities to permanent facilities until Substantial Completion. <br />D. Termination and Removal: Remove each temporary facility when need for its service has <br />ended, when it has been replaced by authorized use of a permanent facility, or no later than <br />Substantial Completion. Complete or, if necessary, restore permanent construction that may <br />have been delayed because of interference with temporary facility. Repair damaged Work, <br />clean exposed surfaces, and replace construction that cannot be satisfactorily repaired. <br />1. Materials and facilities that constitute temporary facilities are property of Contractor. <br />Owner reserves right to take possession of Project identification signs. <br />2. Remove temporary roads and paved areas not intended for or acceptable for <br />integration into permanent construction. Where area is intended for landscape <br />development, remove soil and aggregate fill that do not comply with requirements for <br />fill or subsoil. Remove materials contaminated with road oil, asphalt and other <br />petrochemical compounds, and other substances that might impair growth of plant <br />materials or lawns. Repair or replace street paving, curbs, and sidewalks at temporary <br />entrances, as required by authorities having jurisdiction. <br />3. At Substantial Completion, repair, renovate, and clean permanent facilities used during <br />construction period. Comply with final cleaning requirements specified in <br />Section 017700 "Closeout Procedures." <br />END OF SECTION 015000 <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.