Orange County NC Website
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS <br />Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 015000 - 4/6 <br />1. Provide construction for temporary field offices, shops, and sheds located within <br />construction area or within 30 feet (9 m) of building lines that is noncombustible in <br />accordance with ASTM E136. Comply with NFPA 241. <br />2. Utilize designated area within existing building for temporary field offices. <br />3. Maintain support facilities until Engineer schedules Substantial Completion inspection. <br />Remove before Substantial Completion. Personnel remaining after Substantial <br />Completion will be permitted to use permanent facilities, under conditions acceptable <br />to Owner. <br />B. Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas <br />adequate for construction operations. Locate temporary roads and paved areas as indicated <br />on Drawings. <br />1. Provide dust-control treatment that is nonpolluting and nontracking. Reapply treatment <br />as required to minimize dust. <br />C. Temporary Use of Planned Permanent Roads and Paved Areas: Locate temporary roads and <br />paved areas in same location as permanent roads and paved areas. Construct and maintain <br />temporary roads and paved areas adequate for construction operations. Extend temporary <br />roads and paved areas, within construction limits indicated, as necessary for construction <br />operations. <br />1. Coordinate elevations of temporary roads and paved areas with permanent roads and <br />paved areas. <br />2. Prepare subgrade and install subbase and base for temporary roads and paved areas in <br />accordance with Section 02200 – Earthwork and the Contract Drawings. <br />3. Recondition base after temporary use, including removing contaminated material, <br />regrading, proofrolling, compacting, and testing. <br />D. Traffic Controls: Comply with requirements of authorities having jurisdiction. <br />1. Protect existing site improvements to remain, including curbs, pavement, and utilities. <br />2. Contractor shall coordinate with County staff should traffic controls be needed. <br />3. Contractor shall stage and perform work in such a way to minimize impact to landfill <br />operations. <br />E. Parking: Provide temporary offsite parking areas for construction personnel. <br />F. Storage and Staging: Use designated areas of Project site for storage and staging needs. <br />G. Project Signs: Provide Project signs as indicated. Unauthorized signs are not permitted. <br />1. Identification Signs: Provide Project identification signs as indicated on Drawings. <br />2. Temporary Signs: Provide other signs as indicated and as required to inform public and <br />individuals seeking entrance to Project. <br />a. Provide temporary, directional signs for construction personnel and visitors. <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED