Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS <br />Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 015000 - 3/6 <br />1. Salvage materials and equipment involved in performance of, but not actually <br />incorporated into, the Work. See other Sections for disposition of salvaged materials <br />that are designated as Owner's property. <br />3.2 INSTALLATION, GENERAL <br />A. Locate facilities where they will serve Project adequately and result in minimum interference <br />with performance of the Work. Relocate and modify facilities as required by progress of the <br />Work. <br />B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities <br />are no longer needed or are replaced by authorized use of completed permanent facilities. <br />3.3 TEMPORARY UTILITY INSTALLATION <br />A. General: Install temporary service or connect to existing service. <br />1. Arrange with utility company, Owner, and existing users for time when service can be <br />interrupted, if necessary, to make connections for temporary services. <br />B. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully. <br />1. Connect temporary sewers to municipal system as directed by authorities having <br />jurisdiction. <br />C. Water Service: Install water service and distribution piping in sizes and pressures adequate for <br />construction. <br />D. Water Service: Connect to Owner's existing water service facilities. Clean and maintain water <br />service facilities in a condition acceptable to Owner. At Substantial Completion, restore these <br />facilities to condition existing before initial use. <br />E. Sanitary Facilities: Provide temporary toilets and wash facilities. Comply with requirements of <br />authorities having jurisdiction for type, number, location, operation, and maintenance of <br />fixtures and facilities. <br />F. Electric Power Service: Connect to Owner's existing electric power service. Maintain <br />equipment in a condition acceptable to Owner. <br />G. Electric Power Service: Provide electric power service and distribution system of sufficient size, <br />capacity, and power characteristics required for construction operations. <br />1. Install electric power service underground unless otherwise indicated. <br />2. Connect temporary service to Owner's existing power source, as directed by Owner. <br />3.4 SUPPORT FACILITIES INSTALLATION <br />A. Comply with the following: <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.