Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 015000 - 1/6 <br />SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes requirements for temporary utilities, support facilities, and security and <br />protection facilities. <br />1.3 USE CHARGES <br />A. Installation, removal, and use charges for temporary facilities shall be included in the Contract <br />Sum unless otherwise indicated. Allow other entities engaged in the Project to use temporary <br />services and facilities without cost, including, but not limited to, Owner's construction forces, <br />Engineer, testing agencies, and authorities having jurisdiction. <br />B. Sewer Service: Pay sewer-service use charges for sewer usage by all entities for construction <br />operations. <br />C. Water Service: Pay water-service use charges for water used by all entities for construction <br />operations. <br />D. Electric Power Service: Pay electric-power-service use charges for electricity used by all entities <br />for construction operations. <br />1.4 INFORMATIONAL SUBMITTALS <br />A. Site Utilization Plan: Show temporary facilities, temporary utility lines and connections, staging <br />areas, construction site entrances, vehicle circulation, and parking areas for construction <br />personnel. <br />B. Implementation and Termination Schedule: Within 15 days of date established for <br />commencement of the Work, submit schedule indicating implementation and termination <br />dates of each temporary utility. <br />C. Project Identification and Temporary Signs: Show fabrication and installation details, including <br />plans, elevations, details, layouts, typestyles, graphic elements, and message content. <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.