Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 02300 - 1/1 <br /> <br /> SUBMITTAL FORM <br /> <br />Job Name: Orange County C&D Landfill Phase 2 Construction Submittal No.______ <br /> <br /> Date: __________________ <br /> <br />Description: __________________________________________________________________ <br /> <br /> <br />Contractor’s Certification <br /> <br />Contract Drawing No.: _______________________________ <br /> <br />Specification No.: _______________________________ <br /> <br />This document has been detail-checked for accuracy of content and for compliance with the <br />Drawings and Specifications. The information contained herein has been fully coordinated with <br />all involved Sub-Contractors. <br /> <br />Construction Company: _______________________________ <br /> <br />Date Submitted: _______________________________ <br /> <br />Date: _______________________________ <br />Engineer's Review <br /> <br />Approved <br />Approved As Noted <br />Revise and Resubmit <br />Rejected <br />Not Required by Contract Documents <br /> <br />Approval is only for conformance with the design concept of the Project and compliance with <br />the information given in the Contract Documents. Contractor is responsible for dimensions to <br />be confirmed and correlated at the job site, for information that pertains solely to the fabrica- <br />tion process or to techniques of construction, and for coordination of the work of all trades. <br /> <br />Draper Aden Associates <br /> <br />By:___________________________________________________________________________ <br /> <br />Date:_________________________________________________________________________ <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.