Orange County NC Website
SECTION 013300 - SUBMITTAL PROCEDURES <br />Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 013300 - 5/7 <br />b. Schedules. <br />c. Compliance with specified standards. <br />d. Notation of coordination requirements. <br />e. Notation of dimensions established by field measurement. <br />f. Relationship and attachment to adjoining construction clearly indicated. <br />g. Seal and signature of professional engineer if specified. <br />2. Paper Sheet Size: Except for templates, patterns, and similar full-size Drawings, submit <br />Shop Drawings on sheets at least 12 inches by 18 inches, but no larger than 30 by 42 <br />inches. <br />a. Two opaque (bond) copies of each submittal. Engineer, through Construction <br />Manager, will return one copy. <br />C. Product Schedule: As required in individual Specification Sections, prepare a written summary <br />indicating types of products required for the Work and their intended location. Include the <br />following information in tabular form: <br />1. Type of product. Include unique identifier for each product indicated in the Contract <br />Documents or assigned by Contractor if none is indicated. <br />2. Manufacturer and product name, and model number if applicable. <br />3. Number and name of room or space. <br />4. Location within room or space. <br />D. Qualification Data: Prepare written information that demonstrates capabilities and experience <br />of firm or person. Include lists of completed projects with project names and addresses, <br />contact information of Engineers and owners, and other information specified. <br />E. Certificates: <br />1. Certificates and Certifications Submittals: Submit a statement that includes signature of <br />entity responsible for preparing certification. Certificates and certifications shall be <br />signed by an officer or other individual authorized to sign documents on behalf of that <br />entity. Provide a notarized signature where indicated. <br />2. Installer Certificates: Submit written statements on manufacturer's letterhead, <br />certifying that Installer complies with requirements in the Contract Documents and, <br />where required, is authorized by manufacturer for this specific Project. <br />3. Manufacturer Certificates: Submit written statements on manufacturer's letterhead, <br />certifying that manufacturer complies with requirements in the Contract Documents. <br />Include evidence of manufacturing experience where required. <br />4. Material Certificates: Submit written statements on manufacturer's letterhead, <br />certifying that material complies with requirements in the Contract Documents. <br />5. Product Certificates: Submit written statements on manufacturer's letterhead, certifying <br />that product complies with requirements in the Contract Documents. <br />6. Welding Certificates: Prepare written certification that welding procedures and <br />personnel comply with requirements in the Contract Documents. Submit record of AWS <br />B2.1/B2.1M on AWS forms. Include names of firms and personnel certified. <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED