Orange County NC Website
SECTION 013300 - SUBMITTAL PROCEDURES <br />Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 013300 - 3/7 <br />16. Signature of transmitter. <br />B. Options: Identify options requiring selection by Engineer. <br />C. Deviations and Additional Information: On each submittal, clearly indicate deviations from <br />requirements in the Contract Documents, including minor variations and limitations; include <br />relevant additional information and revisions, other than those requested by Engineer on <br />previous submittals. Indicate by highlighting on each submittal or noting on attached separate <br />sheet. <br />D. Electronic Submittals: Prepare submittals as PDF package, incorporating complete information <br />into each PDF file. Name PDF file with submittal number. <br />1.6 SUBMITTAL PROCEDURES <br />A. Prepare and submit submittals required by individual Specification Sections. Types of <br />submittals are indicated in individual Specification Sections. <br />1. Email: Prepare submittals as PDF package and transmit to Engineer by sending via email. <br />Include PDF transmittal form. Include information in email subject line as requested by <br />Engineer. <br />a. Engineer will return annotated file. Annotate and retain one copy of file as a <br />digital Project Record Document file. <br />B. Coordination: Coordinate preparation and processing of submittals with performance of <br />construction activities. <br />1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other <br />submittals, and related activities that require sequential activity. <br />2. Submit all submittal items required for each Specification Section concurrently unless <br />partial submittals for portions of the Work are indicated on approved submittal <br />schedule. <br />3. Submit action submittals and informational submittals required by the same <br />Specification Section as separate packages under separate transmittals. <br />4. Coordinate transmittal of submittals for related parts of the Work specified in different <br />Sections, so processing will not be delayed because of need to review submittals <br />concurrently for coordination. <br />a. Engineer reserves the right to withhold action on a submittal requiring <br />coordination with other submittals until related submittals are received. <br />C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. <br />Time for review shall commence on Engineer’s receipt of submittal. No extension of the <br />Contract Time will be authorized because of failure to transmit submittals enough in advance <br />of the Work to permit processing, including resubmittals. <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED