Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 013300 - SUBMITTAL PROCEDURES <br />Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 013300 - 3/7 <br />16. Signature of transmitter. <br />B. Options: Identify options requiring selection by Engineer. <br />C. Deviations and Additional Information: On each submittal, clearly indicate deviations from <br />requirements in the Contract Documents, including minor variations and limitations; include <br />relevant additional information and revisions, other than those requested by Engineer on <br />previous submittals. Indicate by highlighting on each submittal or noting on attached separate <br />sheet. <br />D. Electronic Submittals: Prepare submittals as PDF package, incorporating complete information <br />into each PDF file. Name PDF file with submittal number. <br />1.6 SUBMITTAL PROCEDURES <br />A. Prepare and submit submittals required by individual Specification Sections. Types of <br />submittals are indicated in individual Specification Sections. <br />1. Email: Prepare submittals as PDF package and transmit to Engineer by sending via email. <br />Include PDF transmittal form. Include information in email subject line as requested by <br />Engineer. <br />a. Engineer will return annotated file. Annotate and retain one copy of file as a <br />digital Project Record Document file. <br />B. Coordination: Coordinate preparation and processing of submittals with performance of <br />construction activities. <br />1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other <br />submittals, and related activities that require sequential activity. <br />2. Submit all submittal items required for each Specification Section concurrently unless <br />partial submittals for portions of the Work are indicated on approved submittal <br />schedule. <br />3. Submit action submittals and informational submittals required by the same <br />Specification Section as separate packages under separate transmittals. <br />4. Coordinate transmittal of submittals for related parts of the Work specified in different <br />Sections, so processing will not be delayed because of need to review submittals <br />concurrently for coordination. <br />a. Engineer reserves the right to withhold action on a submittal requiring <br />coordination with other submittals until related submittals are received. <br />C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. <br />Time for review shall commence on Engineer’s receipt of submittal. No extension of the <br />Contract Time will be authorized because of failure to transmit submittals enough in advance <br />of the Work to permit processing, including resubmittals. <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.