Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County DAA PN: R00592-226N <br />C&D Landfill Phase 2 Construction April 2021 <br /> 013300 - 1/7 <br />SECTION 013300 - SUBMITTAL PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section Includes: <br />1. Submittal schedule requirements. <br />2. Administrative and procedural requirements for submittals. <br />B. Related Requirements: <br />1. Section 012900 "Payment Procedures" for submitting Applications for Payment and the <br />schedule of values. <br />2. Section 014500 "Quality Control" for submitting test and inspection reports, and <br />schedule of tests and inspections. <br />3. Section 017700 "Closeout Procedures" for submitting closeout submittals and <br />maintenance material submittals. <br />1.3 DEFINITIONS <br />A. Action Submittals: Written and graphic information and physical samples that require <br />Engineer's responsive action. Action submittals are those submittals indicated in individual <br />Specification Sections as "action submittals." <br />B. Informational Submittals: Written and graphic information and physical samples that do not <br />require Engineer's responsive action. Submittals may be rejected for not complying with <br />requirements. Informational submittals are those submittals indicated in individual <br />Specification Sections as "informational submittals." <br />1.4 SUBMITTAL SCHEDULE <br />A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in <br />chronological order by dates required by construction schedule. Include time required for <br />review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include <br />additional time required for making corrections or revisions to submittals noted by Engineer <br />and additional time for handling and reviewing submittals required by those corrections. <br /> <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.