Orange County NC Website
EJCDC® C-625, Certificate of Substantial Completion. <br />Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Page 1 of 1 <br />CERTIFICATE OF SUBSTANTIAL COMPLETION <br />Owner: Orange County Owner’s Project No.: <br />Engineer: Draper Aden Associates Engineer’s Project No.: R00592-226N <br />Contractor: Contractor’s Project No.: <br />Project: C&D Landfill Phase 2 Construction <br />Contract Name: C&D Landfill Phase 2 Construction <br />This ☐ Preliminary ☐ Final Certificate of Substantial Completion applies to: <br />☐ All Work ☐ The following specified portions of the Work: <br />[Describe the portion of the work for which Certificate of Substantial Completion is issued] <br />Date of Substantial Completion: [Enter date, as determined by Engineer] <br />The Work to which this Certificate applies has been inspected by authorized representatives of Owner, <br />Contractor, and Engineer, and found to be substantially complete. The Date of Substantial Completion of <br />the Work or portion thereof designated above is hereby established, subject to the provisions of the <br />Contract pertaining to Substantial Completion. The date of Substantial Completion in the final Certificate <br />of Substantial Completion marks the commencement of the contractual correction period and <br />applicable warranties required by the Contract. <br />A punch list of items to be completed or corrected is attached to this Certificate. This list may not be all- <br />inclusive, and the failure to include any items on such list does not alter the responsibility of the <br />Contractor to complete all Work in accordance with the Contract Documents. <br />Amendments of contractual responsibilities recorded in this Certificate should be the product of mutual <br />agreement of Owner and Contractor; see Paragraph 15.03.D of the General Conditions. <br />The responsibilities between Owner and Contractor for security, operation, safety, maintenance, heat, <br />utilities, insurance, and warranties upon Owner's use or occupancy of the Work must be as provided in <br />the Contract, except as amended as follows: <br />Amendments to Owner’s Responsibilities: ☐ None ☐ As follows: <br />[List amendments to Owner’s Responsibilities] <br />Amendments to Contractor’s Responsibilities: ☐ None ☐ As follows: <br />[List amendments to Contractor’s Responsibilities] <br />The following documents are attached to and made a part of this Certificate: <br />[List attachments such as punch list; other documents] <br />This Certificate does not constitute an acceptance of Work not in accordance with the Contract <br />Documents, nor is it a release of Contractor's obligation to complete the Work in accordance with the <br />Contract Documents. <br />Engineer <br /> <br />By (signature): <br />Name (printed): <br />Title: <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED