Orange County NC Website
EJCDC® C-942, Field Order. <br />Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies <br />and American Society of Civil Engineers. All rights reserved. <br />Page 1 of 1 <br />FIELD ORDER NO.: [Number of Field Order] <br />Owner: Orange County Owner’s Project No.: <br />Engineer: Draper Aden Associates Engineer’s Project No.: R00592-226N <br />Contractor: Contractor’s Project No.: <br />Project: C&D Landfill Phase 2 Construction <br />Contract Name: <br />Date Issued: Effective Date of Field Order: <br />Contractor is hereby directed to promptly perform the Work described in this Field Order, issued in <br />accordance with Paragraph 11.04 of the General Conditions, for minor changes in the Work without <br />changes in Contract Price or Contract Times. If Contractor considers that a change in Contract Price or <br />Contract Times is required, submit a Change Proposal before proceeding with this Work. <br />Reference: <br />Specification Section(s): <br />Drawing(s) / Details (s): <br />Description: <br />[Description of the change to the Work] <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Attachments: <br />[List documents supporting change] <br />Issued by Engineer <br />By: <br />Title: <br />Date: <br /> <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED