Orange County NC Website
EJCDC® C-940, Work Change Directive. <br />Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Page 1 of 1 <br />WORK CHANGE DIRECTIVE NO.: [Number of Work Change Directive] <br />Owner: Orange County Owner’s Project No.: <br />Engineer: Draper Aden Associates Engineer’s Project No.: R00592-226N <br />Contractor: Contractor’s Project No.: <br />Project: C&D Landfill Phase 2 Construction <br />Contract Name: <br />Date Issued: Effective Date of Work Change Directive: <br />Contractor is directed to proceed promptly with the following change(s): <br />Description: <br />[Description of the change to the Work] <br />Attachments: <br />[List documents related to the change to the Work] <br />Purpose for the Work Change Directive: <br />[Describe the purpose for the change to the Work] <br />Directive to proceed promptly with the Work described herein, prior to agreeing to change in Contract <br />Price and Contract Time, is issued due to: <br />Notes to User—Check one or both of the following <br />☐ Non-agreement on pricing of proposed change. ☐ Necessity to proceed for schedule or other reasons. <br />Estimated Change in Contract Price and Contract Times (non-binding, preliminary): <br />Contract Price: $ [increase] [decrease] [not yet estimated]. <br />Contract Time: days [increase] [decrease] [not yet estimated]. <br />Basis of estimated change in Contract Price: <br />☐ Lump Sum ☐ Unit Price ☐ Cost of the Work ☐ Other <br /> Recommended by Engineer Authorized by Owner <br />By: <br />Title: <br />Date: <br /> <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED